The invention discloses a
building process of a protection tube of a FPSO (floating product storage and offloading)
seawater lift pump. The
building process includes: S1, respectively building an upper structure and a lower structure of the protection tube of the
seawater lift pump; S2, locating the lower structure of the protection tube of the
seawater lift pump at a reserved position of a
hull, and hoisting the upper structure to be docked with the lower structure; S3, docking a platform on the upper structure with a
hull platform. In addition, the invention further discloses a hoisting process of the protection tube of the FPSO seawater lift pump. The hoisting process includes: T1, hoisting the
hull on an eleventh foundation section, mounting and positioning; T2, manufacturing a locating adjustment device; T3, manufacturing a guide plate; T4, docking the upper structure of the protection tube with the eleventh foundation section,
welding and fixing. The protection tube of the seawater lift pump is divided into the long upper structure and the short lower structure which are built separately, so that paint wear during hoisting after the structures of the protection tube are integrally coated is avoided, repeated
coating period is shortened, hoisting accuracy is easy to control, and difficulty in local paint make-up after the structures of the protection tube are mounted is lowered.