Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

58results about How to "Effective stress increase" patented technology

Full-section sealing extrusion grouting method

InactiveCN102182470AKeep abreast of the reinforcement effectReduce pore water pressureUnderground chambersTunnel liningSleeve valveSlurry
The invention relates to an auxiliary method for tunnel excavation construction, namely, a full-section sealing extrusion grouting method for tunnel excavation, comprising a working surface slurry stop wall, grouting holes and discharge checking holes, wherein the slurry stop wall can improve the drilling precision of the grouting hole and the discharge checking hole, and also can prevent the phenomenon of grout oozing out of the working surface due to overhigh grouting pressure. The grouting holes are uniformly distributed in a working surface in the annular direction and the radial direction, and the discharge checking holes and the grouting holes are arranged at intervals and both incline by a certain angle during drilling. The discharge checking holes are arranged between endless belts of the grouting holes, so as to be beneficial to the smooth discharge of clearance water in a soft soil layer when the clearance water is extruded during grouting, and be convenient for coring of rock soil body after grouting so as to check the grouting effect of the working surface. A sleeve valve pipe (namely a splitting grouting pipe) is adopted as the grouting pipe, and a retreating type splitting grouting method is adopted to conduct grouting sequentially from the periphery to the inner ring of of the working surface. According to the design, the stability of the working surface during the excavation of the tunnel in the soft soil layer can be ensured, and sediment quantity caused by the tunnel excavation can be reduced.
Owner:TONGJI UNIV

Vacuum drainage anchor rod and construction method thereof

The invention provides a vacuum drainage anchor rod and a construction method thereof. The anchor rod is composed of an anchoring system and a vacuum drainage system; a thread is arranged at the frontend of each hollow anchor pipe, the middle rear part of each hollow anchor pipe is connected with a slurry outlet pipe, water permeable holes are formed in each hollow anchor pipe which is wrapped bya filter screen, a rubber sleeve valve and a geotextile bag sleeve an opening of each slurry outlet pipe, and each geotextile bag is clamped in the corresponding hollow anchor pipe through a hoop; the hollow anchor pipes are obliquely arranged in a slope, pressure grouting is conducted on the interior and the periphery of the front end of each hollow anchor pipe, and the hollow anchor pipes are anchored on backing plates through anchorage devices; a controller and a vacuum pump are installed outside the slope; moisture meters are embedded in the slope and connected with the controller; waterabsorbing pipes penetrate through sealing covers and are inserted into the hollow anchor pipes, connected with a drain pipe through sealing joints and connected with the vacuum pump; the controller and the vacuum pump are switched on, pumping starts to be conducted, a negative pressure zone is formed in each hollow anchor pipe, and the water in the slope enters a water suction pipe and then is discharged out of the slope. Accordingly, the structure is simple, anchorage and drainage can be achieved simultaneously, a good effect is achieved, construction is easy, and the manufacturing cost is low.
Owner:NINGXIA UNIVERSITY

Static blasting and energy-gathering device and blasting method thereof

ActiveCN104776765ASpeed ​​up blasting timeReduce dosageBlastingUnit volumeEngineering
The invention discloses a static blasting and energy-gathering device. The static blasting and energy-gathering device comprises a main body protective barrel which is formed by splicing two circular-arc-shaped steel templates which are not connected, wherein a connecting line of middle points of the two circular-arc-shaped steel templates is perpendicular to a pre-splitting line; a splitting angle is arranged on the outer part of each circular-arc-shaped steel template, and the tip end of the splitting angle and the pre-splitting line are positioned on the same straight line. A method for blasting by applying the static blasting and energy-gathering device comprises the following steps: 1) drilling; 2) placing a static stone-breaking and energy-gathering device; 3) pouring stone breaker slurry for breaking stones; 4) recycling. According to the static blasting and energy-gathering device and the blasting method provided by the invention, the problems of long crushing time, high dosage for crushing and the like can be solved, the static crushing and blasting time is shortened, the dosage per crushing volume is reduced, and the crushing efficiency of a static crushing agent is improved.
Owner:泰州市海通资产管理有限公司

Method Implemented In A Computer For The Numerical Simulation Of A Porous Medium

The object of the invention is a method implemented in a computer for the numerical simulation of a porous medium that may comprise multiple interacting hydraulic fractures in continuous or naturally fractured medium. The method calculates numerically the propagation of a crack, or set of cracks, for instance under the fluid pressure imposed artificially through a well or perforation in a rock mass. This is accomplished by using the Finite Element Method and the special elements named zero-thickness interface or joint elements in the specialized literature, which are pre-inserted along all potential crack paths in the rock mass (pre-existing natural and artificial fractures plus main potential new fracture paths).
Owner:REPSOL SA +1

Wet and soft soil foundation treatment method

The invention discloses a wet and soft soil foundation treatment method which comprises the steps of 1, backfilling completely within the roadbed width range; 2, before roadbed construction, firstly, removing surface water, and then removing the surface layer salinized soil and surface organic matter of a construction region; 3, backfilling gravel soil within the treatment range, and carrying out primary rolling; after rolling is finished, leveling to form a cross slope; 4, excavating two trapezoid drainage ditches respectively at the two sides of a roadbed; 5, laying a plastic drainage plate; 6, dynamic compaction, compacting by points for twice and fully compacting for once; 7, after dynamic compaction treatment, rearranging the roadbed, and cleaning the overground part of the top of the drainage plate; laying a middle coarse sand cushion layer as a drainage channel, wherein the gradient of the middle coarse sand cushion layer is equal to that of the roadbed; placing a bending part of the plastic drainage plate in the center of the sand cushion layer to enable the bending part to be communicated with the sand cushion layer; 8, backfilling gravel soil onto the middle coarse sand cushion layer; 9, after the roadbed is finished, laying gravel on the surface layer, rolling and compacting.
Owner:JINAN MUNICIPAL ENG DESIGN & RES INSITITUTE GRP

Structure and method for dissipating excess pore water pressure and reinforcing shield tunnel soil body

InactiveCN103422868AIncrease soil effective stressAccelerate soil consolidationUnderground chambersTunnel liningStructural engineeringStructure of the Earth
The invention discloses a structure for dissipating excess pore water pressure and reinforcing a soil body around a shield tunnel. The structure comprises pipe pieces, first type grouting holes, second type grouting holes and infiltration bars, wherein the first type grouting holes and the second type grouting holes are formed in the pipe pieces, the infiltration bars are arranged to be hollow, and holes are drilled all over the bodies of the infiltration bars. The infiltration bars are integrally arranged inside the pipe pieces in a buried mode through the first type grouting holes, the tail ends of the infiltration bars are connected with the first type grouting holes, the first type grouting holes with the infiltration bars are distributed with the second type grouting holes as centers, four first type grouting holes with the infiltration bars are distributed in the adjacent periphery of each second type grouting hole, and four second type grouting holes used for grouting are distributed in the adjacent periphery of each first type grouting hole provided with the infiltration bar. According to the structure, the infiltration bars are inserted into the grouting holes of the pipe pieces and the infiltration bars are used for extracting water in surrounding soil, so that an infiltrating path is provided for the water contained in the soil body around the tunnel, excess pore water pressure is dissipated, effective stress of the soil is increased and soil solidification is accelerated.
Owner:TONGJI UNIV

Foundation heating device and construction method for foundation heating combined vacuum prepressing of soft soil foundation by applying such device

The invention discloses a foundation heating device and a construction method for foundation heating combined vacuum prepressing of a soft soil foundation by applying such device. Vertical plastic draining plates are arranged in a foundation, plate heads of the vertical plastic draining plates are connected to transversely arranged filter pipes, outlet ends of all filter pipes are communicated with an inlet of a pressure guiding flow separating device, heating devices are further arranged in the foundation, a sand cushion layer is paved on the foundation, the filter pipes are buried in the sand cushion layer, a thermal insulation layer is paved on the sand cushion layer, and a sealing film is paved on the thermal insulation layer to form a closed vacuum prepressing system. During work, the pressure guiding flow separating device is firstly opened to perform foundation reinforcing treatment by a general vacuum prepressing method; when general drainage consolidation is performed to the later stage, a temperature control heating body is opened to perform foundation heating, meanwhile the foundation is vacuumized, and by controlling a foundation heating temperature and a foundation absolute pressure, water content in the foundation is converted to a gas state from a liquid state, and therefore, the water content of the foundation is further reduced, and the strength of the foundation is increased.
Owner:TIANJIN UNIV

Vacuum net water suction method and special water drainage board

This invention discloses a water-absorbing method by vacuum drainage pipes, the following steps are immersing at least one vertical vacuum drain pipe in the vertical drainage body driving in the vertical diainage pipe into the soft ground; connecting the top of the vacuum drainagepe with the horizontal vacuum pipe network; vacuumize any one or more nodal points. This invention absorbs water by the aid of vertical vacuum drainage pipe imbedded in the drainage body, and the vacuum surface affects directly the bottom of the drainage body and speed the concretion rate because of the agreement between the direction of water flow and gravity. The other advantage is that the joint between pipes can be sealed closely and improves the efficiency of construction.
Owner:任再永 +1

Foundation pit support method of soft soil foundation

The invention discloses a foundation pit support method of soft soil foundation. Vacuum preloading is carried on soft soil road sections as the foundation pit support is carried on undercrossing construction of the soft soil highway. The construction steps are as follow: firstly, cement-soil mixing piles are erected at the corresponding positions on ground at two sides of the undercrossing road section and the soft soil road section is divided into a plurality of closed areas by the cement-soil mixing piles; plastic drainage plates are erected in a certain space in each closed area; sand cushion is paved on the ground in each closed area and a filter strainer is embedded in the sand cushion; the sand cushion is covered by a sealing film so as to be separated from air; a vacuum pump is communicated with the filter strainer in the sand cushion and exhausts to discharge air in the sealing film; finally, vacuum value in the sealing film is kept to be more than 80 KPa. As the preloading of undercrossing road section is stopped, the foundation degree of consolidation is required to be more than 80% and then foundation pits in the undercrossing road section are excavated and parapets in the undercrossing road section are set.
Owner:范娟娟

Supersaturated potassium chloride cement paste for well cementation

InactiveCN104610949AThickening time controllableSimple recipeDrilling compositionMirabiliteHigh pressure
The invention discloses supersaturated potassium chloride cement paste for well cementation. The cement paste is prepared from the following components: high sulfate-resistant G-grade cement, a salt-bearing fluid loss reducer, a preservative, a retarder, water, potassium chloride, a reinforced anti-migration additive, an expanding agent and a weighting agent. The supersaturated potassium chloride cement paste has the effects of stabilizing a well wall and improving the well wall strength; supersaturated potassium chloride assists a cement paste to resist the influence of mirabilite, gypsum, sodium, potassium, magnesium and other halite in an evaporite bed; the technology is reliable; the field construction is simple and convenient; the well cementation effect is good; the requirements on well cementation in the evaporite bed, a high-pressure deep well evaporite bed and a super-thick evaporite bed and other complex conditions can be met; the supersaturated potassium chloride cement paste has favorable application prospect particularly for the exploration and development of a potassium bittern water well.
Owner:CHINA NAT OFFSHORE OIL CORP +2

Method for carrying out dynamic compaction composite treatment on sludge soil foundation through gravel piles, drain board and upper filling body

The invention provides a method for carrying out dynamic compaction composite treatment on a sludge soil foundation through gravel piles, a drain board and an upper filling body, and belongs to the technical field of building foundation treatment. The method comprises the steps that S1, a construction cushion layer is laid; S2, construction of the gravel piles is achieved, and a vibration sunken tube method is adopted; S3, geotechnical cloth and a cushion layer below the tops of the gravel piles are laid; S4, construction of the plastic drain board is achieved; S5, an upper cushion layer and geotechnical cloth are laid; and S6, layered and staged dynamic compaction of the filling body is achieved. By means of the method, the advantages of preloading and dynamic compaction dynamic consolidation of the gravel piles and the plastic drain board are achieved fully, the advantages are complemented, and the defects of a single foundation treatment method are avoided.
Owner:山西机械化建设集团有限公司

Suction anchor rod device

A suction anchor rod device comprises a hollow columnar anchor rod. A bottom opening of the anchor rod is sealed, a top opening of the anchor rod is provided with a sealing cover plate, and the sealing cover plate and the anchor rod are detachably connected. The section, close to the bottom opening, of the anchor rod is defined as a bottom section, the section, close to the top opening, of the anchor rod is defined as a top section, a plurality of sieve holes are distributed in the side wall of the bottom section of the anchor rod, and the sieve holes communicate with an inner cavity of the anchor rod. A lifting disk is arranged in the anchor rod, the lifting disk is arranged in the anchor rod in the manner that the lifting disk can move up and down in the axial direction of the anchor rod through a lifting device, the lifting disk divides the inner cavity of the anchor rod into an upper cavity and a lower cavity, the cavity containing the top opening is defined as the upper cavity, and the cavity containing the bottom opening is defined as the lower cavity. The suction anchor rod device further comprises a pressure testing device used for testing the air pressure in the lower cavity and a pressure adjusting device used for adjusting the air pressure in the lower cavity. The suction anchor rod device utilizes the principle of effective stress, under the situation that the total stress is certain, the effective stress is improved by reducing the excess pore pressure, the anchor rod side friction is increased, and the overall stability and safety are improved.
Owner:ZHEJIANG UNIV OF TECH

Permeation grouting integrated rod suitable for shield tunnel, and construction method

PendingCN109139059AEffective stress increaseDissipate excess pore water pressureUnderground chambersDrainageSoil massPore water pressure
The invention relates to a permeation grouting integrated rod suitable for a shield tunnel, and a construction method of the permeation grouting integrated rod. The permeation grouting integrated rodcomprises a tubular grouting rod, a tubular permeation rod and a grouting tube, wherein a plug is fixed to the head end of the grouting rod, the tail end of the grouting rod is sealed and fixedly connected with the head end of the permeation rod, a partition plate is fixed to the head end of the permeation rod, an end plate is fixed to the tail end of the permeation rod, slurry outlets are evenlyformed in the peripheral wall of the grouting rod, water penetration holes are evenly formed in the peripheral wall of the permeation rod, the grouting rod sequentially passes through the end plate and the partition plate and then extends into the grouting rod, a water outlet pipe is fixed on the end plate, and the water outlet pipe is communicated with the permeation rod after passing through theend plate. The permeation grouting integrated rod has the functions of grouting and drainage, thus can quickly and effectively dissipate excessive pore water pressure caused by shield tunneling, quickly improve the effective stress of a formation soil mass, improving the secondary grouting and grouting reinforcement effect during operation, integrates the permeation rod and the grouting rod, is convenient for installation and convenient to use, and is applicable to the fields of tunnel engineering, underground engineering seepage reinforcement and the like.
Owner:ZHENGZHOU UNIV

Foundation treatment system based on electric heating drainage plates and construction method thereof

The invention discloses a foundation treatment system based on electric heating drainage plates. The foundation treatment system comprises the electric heating drainage plates, wherein each of the electric heating drainage plates comprises a plastic core plate, two layers of filter cloth wrap the periphery of the plastic core plate, and an electric heating wire is arranged in the interlayer between the two layers of filter cloth; the electric heating drainage plates are vertically arranged in the foundation, the head parts of the electric heating drainage plates are bound on filter tubes whichare transversely arranged, a pressure guiding and shunting device is arranged on the foundation, and water inlets of the pressure guiding and shunting device communicate with the filter tubes; a sandcushion is laid on the foundation, the water inlets of the pressure guiding and shunting device, the filter tubes and the head parts of the electric heating drainage plates are laid in the sand cushion, a heat preservation layer is laid on the sand cushion, a sealing film is laid on the heat preservation layer, the pressure guiding and shunting device penetrates through the sealing film, and thepressure guiding and shunting device is isolated from the sealing film; and a power supply wire of the electric heating wires of the electric heating drainage plates is led out of the sealing film through a film penetrating device and is connected with an external power supply, the edges of the sealing film is pressed into film pressing grooves, so that a closed vacuum pre-pressing system is formed.
Owner:TIANJIN PORT ENG INST LTD OF CCCC FIRST HARBOR ENG +2

Gravity type foundation pit supporting system under vacuum effect and construction method

The invention discloses a gravity type foundation pit supporting system under a vacuum effect and a construction method. The system comprises a peripheral vertical sealed curtain, a pit top horizontal sealing layer, a transverse drainage body, a slope surface sealing layer, a slope bottom vertical sealed curtain, a pit top vertical drainage body and a slope surface vertical drainage body. The peripheral vertical sealed curtain is downward vertically installed from an outside boundary of a setting range of the pit top horizontal sealing layer; the pit top vertical drainage body is arranged in foundation soil of the setting range of the pit top horizontal sealing layer; the transverse drainage body is arranged on the surface of the foundation soil at a top end of the pit top vertical drainage body; the pit top horizontal sealing layer is formed on the surface of the transverse drainage body; the slope surface vertical drainage body is arranged in the foundation soil inside the pit top vertical drainage body; the slope surface sealing layer is formed on the slope surface vertical drainage body; the slope bottom vertical sealed curtain is formed in a slope foot of a pit bottom. In the gravity type foundation pit supporting system under the vacuum effect and the construction method provided by the invention, a side wall is not arranged to solidify a wall body and a curtain shielding body, a greater cutting depth requirement can be met, construction cost is low and construction period is shorter.
Owner:CHINA CIVIL ENG CONSTR CORP

Thermal-mechanical-electroosmosis multi-field coupling soft soil consolidation test box

ActiveCN112683745ACheap and economicalEvenly distributed bearing capacityPermeability/surface area analysisWater storageSoil science
The invention discloses a thermal-mechanical-electroosmosis multi-field coupling soft soil consolidation test box, which comprises an outer box body, a heating system, a slideway system, an electroosmosis system, and an air bag device; the outer box body is divided into a water storage area and a soft soil area by an inner partition plate, a water outlet is formed in the bottom of the inner partition plate, and geotechnical cloth is arranged; the heating system comprises a plurality of heaters which are longitudinally arranged in the soft soil area at intervals, and is connected with a heating temperature controller; the slideway system comprises a slide rail, a slide block and a corner brace, the slide rail is longitudinally arranged on the inner wall of the soft soil area, the slide block is arranged on the slide rail, and the heater is fixed on the slide rail through the corner brace; the electroosmosis system comprises a cathode plate and an anode plate which are respectively inserted into the soil samples on the two sides of the soft soil area to form a circuit; the air bag device comprises an air bag counterforce cover plate, an air bag and an air pressure servo control system. The device is simple in installation process, cheap and economical in manufacturing material price, high in operability and short in experiment period. Meanwhile, simulation boxes of different sizes can be manufactured according to different experimental schemes, and the device is economical and environmentally friendly.
Owner:JIANGSU UNIV OF SCI & TECH

Well-point dewatering combined surcharge preloading consolidation device for subgrade and application method of such device

The invention relates to a well-point dewatering combined surcharge preloading consolidation device for a subgrade and an application method of such a device. The consolidation device comprises a water storage unit, well pipes, a main pipe and a water pump; the water storage device is placed in a region to be consolidated of the subgrade; a plurality of well pipes are arranged at predetermined positions around the region to be consolidated; each well pipe is connected with the main pipe, and the main pipe is connected with a water inlet / outlet of the water storage device; the water pump draws water from the well pipes, and conveys water into the water storage device via the main pipe, and the water storage device performs supercharge preloading on the region to be consolidated by means of dead load of water. By utilizing the well-point dewatering combined surcharge preloading consolidation device for the subgrade, the consumption of such materials as gravel and soil can be greatly reduced, the work amount can be lowered, the construction cost can be decreased, and the environmental pollution can be reduced.
Owner:SHANDONG UNIV

Comprehensive tunnel drainage, precipitation and pressure reduction construction method

ActiveCN105484791AReduce head water pressureReduce water pressureDrainageGeomorphologyEarth surface
The invention provides a comprehensive tunnel drainage, precipitation and pressure reduction construction method, relates to an in-tunnel drainage, ground precipitation and comprehensive pressure reduction construction method for a water and mud burst segment of a tertiary system sand shale tunnel and is mainly designed to solve the problems that an existing tunnel is prone to deformation, collapse and even water burst and mud burst in the tertiary system sand shale construction process. Ground precipitation wells are drilled at the positions, eight meters away from the side lines on the two sides, of a ground-direction positive hole, a flat guide hole is formed near the ground-direction positive hole, a drainage hole is formed in the inclined upper direction of the ground-direction positive hole relative to the flat guide hole, tunnel substrate precipitation wells are drilled in both the substrate of the ground-direction positive hole and the substrate of the flat guide hole, a plurality of inclined drainage holes are formed above the inclined front portion of a vault of the ground-direction positive hole, a positive hole vertical drainage hole is formed above the vault of the ground-direction positive hole, and a flat guide hole vertical drainage hole is further formed above the vault of the flat guide hole. The comprehensive tunnel drainage, precipitation and pressure reduction construction method has the advantages that geological disasters such as collapse, deformation, water burst and mud burst are avoided, and tunnel construction safety can be guaranteed.
Owner:CHINA RAILWAY 19TH BUREAU GRP SECOND ENG CO LTD

Treatment method for strengthening soft soil foundation through combination of vacuum pre-pressing and foundation heating method

InactiveCN107338782AReinforcement quality is fully guaranteedAccelerated drainage consolidationSoil preservationWater contentEngineering
The invention discloses a treatment method for strengthening a soft soil foundation through combination of vacuum pre-pressing and a foundation heating method. Vertical plastic water discharging plates are arranged in a foundation, plate heads of the vertical plastic water discharging plates are connected to transversely-arranged filter pipes, and the outlet ends of all the filter pipes communicate with an inlet of a pressure guiding and flow distributing device; heating devices are further arranged in the foundation, a sand cushion layer is laid on the foundation, the filter pipes are embedded in the sand cushion layer, a heat preservation layer is laid on the sand cushion layer, a sealing film is laid on the heat preservation layer, and a closed vacuum pre-pressing system is formed. During work, the pressure guiding and flow distributing device is started firstly, and foundation strengthening treatment is conducted through a conventional vacuum pre-pressing method; when conventional drainage consolidation is conducted to the later period, a temperature control heating body is started for foundation heating, meanwhile, the foundation is subjected to vacuum pumping, water in the foundation is converted into the gas state from the liquid state through control over the foundation heating temperature and the foundation absolute pressure intensity, the water content of the foundation is further reduced, and the strength of the foundation is enhanced.
Owner:TIANJIN PORT ENG INST LTD OF CCCC FIRST HARBOR ENG +3

Method for treating quasi-prepressing groundwork of artificial island

The present invention relates to a tidal zone and shallow water area petroleum sandstone artificial island construction method, in particular, it is a kind of artificial island quasi-precompression foundation treatment method. Said method includes the following steps: firstly, filling inshore weak clay layer surface with island body block stones to make the inshore weak clay layer surface be reached to artificial island construction and design standard before winter stoppage period and form foundation treatment heaped layer; then utilizing the packed island self-weight to increase effective stress of lower portion weak clay layer under sea-water so as to raise load-bearing capacity of foundation; after the sea is opened, continuously filling said weak clay layer with sandstone and mountain slope earth and rolling until the weak clay layer is reached to designed standard; finally, making upper portion building of island body.
Owner:LIAOHE GASOLINEEUM EXPLORATION BUREAU

Suction pile with suction device arranged at pile end

The invention discloses a suction pile with a suction device at the pile end. The suction pile is characterized in that the top end of a pile body is located in a bearing platform and upwards supportsthe bearing platform, the bottom end of the pile body vertically extends downwards and is embedded into a soil body, and the bottom end of the pile body is connected with the suction device; the topend of the suction device is hermetically embedded in the pile body and is fixedly connected with the pile body, and the bottom end of the suction device extends downwards and extends out of the pilebody; the suction device is in a hollow cylinder shape, the top end of the suction device is fixedly provided with a sealing end surface which is hermetically separated from the pile body, and a plurality of screen holes communicating with the inner cavity of the suction device are uniformly distributed on the side wall of the suction device; an air outlet in the top end of an air suction pipe isformed in the top surface of the bearing platform, and an air inlet in the bottom end of the air suction pipe hermetically penetrates through the bearing platform and the pile body and extends into the suction device, and the air inlet in the bottom end of the air suction pipe communicates with the inner cavity of the suction device; and a vacuum valve hermetically penetrates through a sealing cover plate and is arranged on the air outlet in the top end of the air suction pipe, and a pressure measuring meter and the air suction pipe are in hermetical communication.
Owner:ZHEJIANG UNIV OF TECH

Reverse three-claw type centering support structure for hole mortar anchor rod

PendingCN108716217AEffect achievedTo achieve the purpose of keeping the centerExcavationsBulkheads/pilesBiochemical engineeringSelf weight
The invention discloses a reverse three-claw type centering support structure for a hole mortar anchor rod. A rock-soil body, the anchor rod, a first centering support, a second centering support anda third centering support are included; a hole is formed in the rock-soil body, and is internally provided with the anchor rod; the outer side wall of the anchor rod is fixedly connected with the first centering support, the second centering support and the third centering support at equal intercepted intervals through welding surfaces; first connection rods and second connection rods are sequentially welded to of the sides, close to the anchor rod, of the first centering support, the second centering support and the third centering support; and a reverse triangular support is fixedly connected to the top end of the other sides of the first centering support, the second centering support and the third centering support. According to the reverse three-claw type centering support structure for the hole mortar anchor rod, due to the fact that the outer side wall of the anchor rod is fixedly connected with the first centering support, the second centering support and the third centering support at equal intercepted intervals through the welding surfaces, the purpose of keeping the anchor rod in the middle in the hole is achieved, and it is prevented that under the self-weight effects,the anchor rod is tightly attached to the rock-soil body.
Owner:LANZHOU UNIVERSITY

Reinforcing device for variable pressure and vacuum pumping of soft soil and application method thereof

PendingCN109162272AMake up for the lack of diffusion vacuumSolve the cloggingSoil preservationVacuum pumpingEngineering
The invention provides a reinforcing device for variable pressure and vacuum pumping of soft soil and an application method thereof. The reinforcing device for variable pressure and vacuum pumping ofthe soft soil comprises a vacuum pumping drainage mechanism arranged in silt, wherein the vacuum pumping drainage mechanism comprises drainage pipes horizontally arranged, first plastic drainage plates vertically arranged and a vacuum pump. The first plastic drainage plates are cavities which are formed by core plates located in the middle part and filter membranes coated on the outer sides of thecore plates, and the upper potion and the lower portion of the cavity are opened. The vacuum pump communicates with the upper ends of a plurality of first plastic drainage plates in a cavity shape through the drainage pipes, and a plurality of vacuum degree monitoring reflector are distributed on the core plates at height. According to the reinforcing device for variable pressure and vacuum pumping of the soft soil and the application method thereof, the problem that the pre-pressing vacuum degree is inadequate, the drainage plates is silted and blocked, and the drainage rate is too low can be solved.
Owner:TIANJIN RES INST FOR WATER TRANSPORT ENG M O T

Weather-resistant hydrogel roadbed operation period water content and dense state regulation and control method

The invention belongs to the technical field of weather-resistant hydrogel roadbeds, particularly relates to a weather-resistant hydrogel roadbed operation period water content and dense state regulation and control method, and provides the following scheme aiming at the problem that an existing roadbed is inconvenient to automatically regulate and control when the water content is too much or too little: the method comprises the following steps: S1, cleaning and compacting the surface of a foundation; S2, preparing a hydrogel roadbed filler; S3, laying the prepared hydrogel roadbed raw material on the surface of the foundation to form a first layer of improved roadbed; and S4, laying a plurality of layers of plain soil roadbed on the surface of the improved roadbed. The water absorption and release functions of the modified resin and the characteristics of the gel state are combined for mixed use, the roadbed is laid and improved in a layered mode, when the water content in the roadbed is increased to a certain threshold value, the modified resin can absorb water and is slightly swelled, a strength and compactness protection layer can be formed on the connection section of the foundation and the roadbed and the connection section of the roadbed and the pavement, and the pot cover effect is prevented.
Owner:SHANDONG UNIV

Test method for simulating shear resistant strength change of foundation pit precipitation soil

The invention relates to a test method for simulating the shear resistant strength change of foundation pit precipitation soil. The test method comprises the following steps of: firstly, preparing an original-shape soil sample by using a fret saw, a soil cutter, a soil cutting disk, and the like; secondly, carrying out exhausting and water injection on the sample in a vacuum tank to be saturated;thirdly, mounting a test sample in which a latex film is sleeved in a three-axle pressure chamber; fourthly, solidifying the test sample at two phases through a three-axle ambient pressure system, wherein the test sample is restored to be in a natural self-weight stress state of a soil body by using the first-time solidification and the stress state of the soil body subjected to precipitation is simulated by using secondary solidification; fifthly, carrying out an un-drained shear test on the test sample through an axial loading system; and sixthly, after the test is ended, closing a motor and a valve and detaching the test sample. According to the test method disclosed by the invention, the influence of the reduction for water content of the foundation pit precipitation soil, the increase of effective stress and soil solidification and compaction on the soil shear resistant stretch is considered so as to provide reference for accurately selecting shear resistant strength indexes of the foundation pit precipitation soil and further provide guarantee for designing and constructing deep foundation pits of soft soil water-rich stratum safely, economically and reasonably.
Owner:TONGJI UNIV

Drainage structure for accelerating consolidation of sludge soil dredged body of dam engineering and construction method thereof

The invention discloses a drainage structure for accelerating consolidation of a sludge soil dredged body of dam engineering and a construction method thereof. The drainage structure comprises a polder dyke, a levee, a sludge soil dredged area between the polder dyke and the levee, and a drainage channel formed in the sludge soil dredged area. The drainage channel comprises a plurality of drainageblind ditches which are horizontally located in the bottom of the sludge soil dredged area, and a plurality of drainage sand wells vertically arranged in the sludge soil dredged area, and the drainage blind ditches are used for bearing water flowing into or seeping from the drainage sand wells. By adopting the technical scheme, compared with the prior art, the drainage structure has the followingadvantages that the horizontal drainage blind ditches and the vertical drainage sand wells are arranged at the bottom of the sludge soil dredged area to form the three-dimensional drainage channel, the drainage capacity is greatly enhanced, pore water pressure dissipation is accelerated, soil effective stress is improved, and soil consolidation is accelerated.
Owner:POWERCHINA ZHONGNAN ENG

Construction method for underwater well point dewatering reinforcement pile forming

The invention discloses a construction method for underwater well point dewatering reinforcement pile forming. The construction method comprises the following steps that S1, the initial water level and the mud surface depth are determined, and well point measuring and positioning are completed; S2, pressing a dewatering well pipe into the bottom mud; S3, a pore water pressure gauge and a submersible pump are placed in a dewatering well casing, and water pumping is tested; S4, after test water pumping is completed, the submersible pump and a drainage pipe are connected; S5, a water pumping system is started, and water pumping is stopped when the water level meets the design requirement; and S6, the dewatering well pipe is taken out, and gravel is backfilled. According to the construction method, the operation process is simple, the construction period is short, the construction sequence of dewatering firstly and then backfilling and pile forming in a well pipe hole is adopted, tube well point dewatering and backfilling and pile forming in the well pipe hole are combined, the underwater soft foundation is reinforced, the bearing capacity of the soft foundation is effectively improved, and good engineering application prospects are achieved.
Owner:CCCC FOURTH HARBOR ENG CO LTD +2
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products