32results about How to "Control disturbance" patented technology

Shielding spiral conveyor hydraulic system with proportional feedback control and accumulator oil supplementary

A hydraulic system of shield spiral conveying machine with ratio feedback control and energy storing device for oil supplement consists of a three-position and four-way solenoid change valve, a motor, a rotation sensor, a one-way valve, a liquid-controlled one-way valve, a throttle valve, a two-position and two-way solenoid reversal valve, a shift sensor, a hydraulic cylinder, a range switch, a stop ball valve, a unloading valve, an overflow valve and an energy storing device. The machine has a sensor to monitor rotation and makes variable pump controlled according soil cabin pressure so as to control soil discharge volume and to achieve a hydraulic control system of a continuous real time controllable spiral-conveying machine. The energy-storing device is used oil supplement to close exhaust outlet reliably when accident occurs to guarantee safety for tunnel engineering. The electric feedback and ratio feedback are used to control turbulence to soil body when shield tunneling and reduce settlement of earth surface. The machine can be adaptable for various strata reliably.
Owner:ZHEJIANG UNIV

Super early receiving supporting structure of shield machine and super early receiving method

The invention relates to a super early receiving supporting structure of a shield machine and a super early receiving method. The super early receiving supporting structure is characterized by comprising a receiving well foundation pit wall support, a bottom plate support and an outlet hole support, wherein the receiving well foundation pit wall support comprises a foundation pit envelope pile, at least two anchor cables and a steel pipe corner support; the outlet hole support is a temporary horizontal support; and the bottom plate support comprises an anti-pulling pile and a concrete bottom plate paved on a foundation pit bottom soil mass. By the super early receiving supporting structure and the super early receiving method, the construction problem that the shield machine cannot be received in advance when the shield machine arrives at a station in advance is successfully solved, the service life of the shield machine is prolonged, the construction cost of a shield interval is saved, and the construction period is shortened. The structure and the method can be applied to the advanced receiving of the shield machine when a receiving well structure is not completely constructed or finished.
Owner:北京城乡建设集团有限责任公司

Vector map reversible information hiding method based on LSD planes

The invention relates to a vector map reversible information hiding method based on LSD planes. Top points of a vector map are sequentially scanned to obtain x-coordinate sequences and y-coordinate sequences of the top points; scaling positions of the coordinates are moved towards the right side to obtain new coordinate sequences; MSD planes and the LSD planes are calculated; the LSD planes are sequenced according to the ascending sequence to obtain orderly LSD planes; watermarks are embedded in the orderly LSD planes; the coordinate sequences of the orderly LSD planes containing the watermarks are adjusted to obtain LSD planes containing the watermarks; the coordinate sequences containing the watermarks are obtained through calculating; scaling positions of the coordinates in the coordinate sequences containing the watermarks are adjusted; a vector map containing the watermarks is obtained.
Owner:HARBIN ENG UNIV

Large-span spherical net frame integral lifting method

The invention discloses a large-span spherical net frame integral lifting method. The large-span spherical net frame integral lifting method lifts large-span spherical net frames by adopting a mode ofcombining integral lifting with segmented lifting; upper chords and lower chords of upper layers of the net frames are integrally lofted through a total station for integral assembly; a reserved value of a springing height is set in the assembly process; multiple lifting equipment is used for integrally lifting and mounting the upper layers of the net frames; upper part structures integrally lifted are used for forming an operation platform; and lower part structures are assembled, lifted and connected in a segmented mode to form a whole, so that the aerial bulking of components is reduced, the scaffold use level is reduced, the aerial workload is reduced, the construction is safe and reliable, the construction risk is reduced, the construction efficiency is improved, and the control of the quality of the net frames and the control of the production safety are facilitated.
Owner:CHENGDU NO 1 CONSTR

Mark based vector map completeness authentication method

The invention provides a mark based vector map completeness authentication method. The method comprises the following steps: identifying vertex coordinates of an embeddable watermark; adaptively dividing map element groups; generating an authentication watermark; embedding the authentication watermark; marking map elements; and performing watermark authentication and original data lossless restoration. According to the method, the map elements of a vector map are adaptively divided into different groups, the authentication watermark is embedded with a reversible information hiding method on the premise of considering a precision error margin of the vector map, and based on a vertex insertion method, a mark is added into each map element to indicate the map element group that the map element belongs to, so that correct division of the map element groups in a watermark authentication stage is ensured, the invisibility is relatively high while the map elements are accurately positioned and tampered, and the map element disordering and the vertex reversed attack can be tolerated; and in addition, through an algorithm, in the watermark authentication stage, the marks are removed, the authentication watermark is extracted, and original data of the vector map are losslessly restored, so that accurate use of vector map data can be effectively ensured.
Owner:徐州市神山智能科技有限公司

Throttle control device for internal combustion engines

A throttle control device having a quick response and a control stability in the ISC running mode of an internal combustion engine comprises: feedback control means for outputting an amount of activation for activating a drive motor by using a predetermined control gain such that the real opening of a throttle valve detected by a throttle opening sensor for detecting the real opening of the throttle valve may be equalized to either a desired opening based on at least the depression of the accelerator pedal or a desired opening at the ISC time based on at least the speed of the internal combustion engine; and correction coefficient adjusting means for correcting the activation amount outputted from the feedback control means, with a predetermined correction coefficient on the basis of the decision result of a throttle operation mode deciding means for deciding the operation mode of the throttle valve.
Owner:MITSUBISHI ELECTRIC CORP

Sample introduction system used for ion-mobility spectrometry detector

The invention relates to a sample introduction system used for an ion-mobility spectrometry detector. The sample introduction system includes a sample introduction shell; and the sample introduction shell is provided with a sample introduction capillary used for connecting the sample introduction system and an ion tube. Through the adoption of the sample introduction system, the pressure values ofan ion tube negative pressure zone, a sample gasification zone and external atmosphere are P2, P1 and P0, the relation of the ion tube negative pressure zone, the sample gasification zone and the external atmosphere is P2 < P1 < P0, and gas flow direction can be realized by the established pressure relation, so that the purpose of sample introduction can be achieved; the sample introduction capillary is the channel for introducing samples; and through the controlling of the size of the capillary and the difference value of the P2 and P1, the sample introduction speed and gas flow of the samples and the disturbance of the gas flow in the ion tube can be effectively controlled.
Owner:THE THIRD RES INST OF MIN OF PUBLIC SECURITY

Multi-tunnel construction method based on soft interlayer

The invention discloses a multi-tunnel construction method based on a soft interlayer. The method comprises the following steps of measuring the position of the soft interlayer, and uniformly distributing guide pipes on the soft interlayer, grouting the soft interlayer through the guide pipes to form a grouting area; uniformly distributing a plurality of tunnels to be constructed on the two sidesof the soft interlayer, measuring the rock and soil mass parameters of the tunnels;uniformly distributing blast holes in a core area, arranging blast holes and energy absorption holes in a buffer area, wherein the blast holes in the buffer area are surrounded by the energy absorption holes; continuously blasting the non-adjacent tunnels according to a preset sequence until all the tunnels are exploded, wherein when the displacement change amount of the surrounding rock and / or the change amount of the surface subsidence is larger than a preset threshold value, grouting is carried out on the soft interlayer through the guide pipes, the number of the blast holes is reduced and / or the amount of explosives in the blast holes is reduced, continuously blasting the non-adjacent tunnels according to a preset sequence, and enabling the displacement change amount of the surrounding rock and / or the surface settlement change amount is smaller than a preset threshold value.
Owner:中建华东投资有限公司 +2

Construction method for RJP utilized reversely built enclosure structure

InactiveCN111456021AMeet the constructionMeet the reinforcement strength requirementsExcavationsBulkheads/pilesReinforced concreteArchitectural engineering
The invention relates to the field of foundation pit engineering enclosure structure construction, in particular to a construction method for a RJP utilized reversely built enclosure structure. The method comprises the following steps that grouting reinforcement treatment is conducted on surrounding stratums of an existing pile foundation and an existing bearing platform within the foundation pitengineering influence range through sleeve valve pipes; RJPs are constructed on the side, invading the enclosure structure, of the existing pile foundation; secant pile enclosure structures on the twosides of the existing pile foundation are constructed, and it is ensured that reinforced concrete piles are occluded with the RJPs; a soil body around the existing pile foundation is excavated, and anewly-added pile foundation and a newly-added bearing platform are constructed; and the site is restored, and other secant piles and foundation pit side walls are constructed. The construction of thefoundation pit enclosure structure can be completed under the condition of intrusion of the adjacent existing pile foundation, the stratum reinforcing strength requirement is met, the waterproof andstress problems are solved, the pile forming quality can be effectively guaranteed, disturbance to an existing building (structure) can be effectively reduced, and sedimentation and deviation of surrounding stratums and pipelines are effectively controlled.
Owner:ERCHU CO LTD OF CHINA RAILWAY TUNNEL GRP +1

Vector map integrity authentication method

The invention provides a vector map integrity authentication method. The method comprises the following steps of classifying primitive vertexes; dividing data units; associating the data units; constructing locating information; generating an authentication watermark; embedding the authentication watermark and the locating information; marking primitives; and performing watermark authentication and original data lossless recovery. According to the method, the primitives of a vector map (line or surface) are divided into different data units; the associated data units are allocated to the data units and the locating information of the data units is constructed; the embedding of the authentication watermark and the embedding of the locating information in the associated data units are realized by utilizing a reversible information hiding method; and the data units which the primitives belong to are marked, thereby ensuring accurate locating of the tampered data units and recovery of original data of the non-tampered data units. In addition, original regions of the tampered data units can be accurately located by utilizing the locating information stored in the associated data units of the tampered data units, thereby ensuring reliable application of vector map data.
Owner:XUZHOU NORMAL UNIVERSITY

Vector map integrity authentication method for tampered primitive set positioning

ActiveCN107154011APosition tampering is accurateLossless recovery of original dataImage data processing detailsNon destructiveInformation embedding
The invention provides a vector map integrity authentication method for tampered primitive set positioning. The method comprises steps of primitive vertex classification, adaptive primitive set division based on a simulated annealing method, authentication watermark generation, authentication watermark embedding, primitive marking, watermark authentication, and non-destructive original data restoration. With the simulated annealing method, vector map primitives are divided into different groups adaptively. On the premise that the precision error tolerance of the vector map is considered, watermark authentication and primitive set information embedding are realized by using a reversible information hiding method, so that the tampered primitive can be localized accurately, the invisibility is high, and no extra storage space is needed. In addition, with the vector map integrity authentication method, at the watermark authentication stage, the tampered primitive set can be localized accurately, the original vector map data can be restored in a non-destructive manner after watermark authentication to guarantee reliable application of the vector map data.
Owner:XUZHOU NORMAL UNIVERSITY

Frame type Christmas snowfall simulation device

The invention discloses a frame type Christmas snowfall simulation device which consists of a fan, a snow collecting hopper, a snow conveying pipe, simulated snow, a fame and a cover body, wherein the frame is formed by assembling a strip-shaped connecting rod and a joint which are detachably connected, the cover body is arranged on the frame, the snow collecting hopper is positioned at the lower end of the cover body, an air outlet of the fan is arranged at the bottom of the snow collecting hopper and opposite to the lower end of the snow conveying pipe, and the upper end of the snow conveying pipe is arranged at the upper end of the frame and the cover body. The frame type Christmas snowfall simulation device has the advantages of variable size, variegated shape, low cost, convenient packaging and transportation, firm structure, capability of being suitable for landing placement and hanging placement, clear and real snowing effect, attractive shape and appearance decoration and capability of being conductive to enhancing the Christmas atmosphere.
Owner:南京红屋礼品有限公司 +2

Mud pump damming integrated machine

The invention discloses a mud pump damming integrated machine. The mud pump damming integrated machine comprises an axle, an earth material storage container, an earth material conveying system, an earth material vibrating screen, a mud production device and a mud conveying pump; the earth material storage container, the earth material conveying system, the earth material vibrating screen, the mud production device and the mud conveying pump are arranged on the axle; one end of the lower portion of the earth material storage container is provided with an earth material breaking mechanism; the earth material conveying system is located under the earth material storage container; the earth material vibrating screen is located under the earth material conveying system; the mud production device is located under the earth material vibrating screen; earth materials and water which is supplied by a water supply system are mixed into mud through the mud production device; the water supply system is arranged on the lower portion of the mud production device and is communicated with the mud production device; the mud conveying pump is located in front of the mud production device and is communicated with the mud production device. According to the mud pump damming integrated machine, the problems that the water drop damming dam site selection is limited, the mud concentration cannot be controlled, the quality of a dam body is non-uniform, geological disasters such as landslides are easy to cause, working conditions of the operating personnel are poor, the labor intensity is large, and the security is difficult to guarantee are solved, the mechanization and the automation of check dam construction are achieved, and the construction quality and efficiency is improved.
Owner:陕西省水土保持局

Charging device for presplitting blasting of peripheral holes of roadway

The invention belongs to the field of blasting, and particularly discloses a charging device for presplitting blasting of surrounding holes of a roadway, the middle of a shock-insulation energy-gathering pipe is recessed inwards to form an energy-gathering groove, a top cover plate is arranged at the upper end of the shock-insulation energy-gathering pipe, a bottom cover plate is arranged at the lower end of the shock-insulation energy-gathering pipe, and blasting charges and air columns in the shock-insulation energy-gathering pipe are designed at intervals. A circle of pressure-bearing water medium is arranged on the periphery of the explosive bag, and a wood chip spacing bag is arranged between the explosive bag and the air column. On the basis of the confined water blasting action principle, the presplitting blasting method adopting confined water and air column spaced charging is provided, and the presplitting blasting method has positive significance in guaranteeing smooth blasting of peripheral holes, improving the forming effect of a hard rock roadway, controlling the charging cost and guaranteeing safe production.
Owner:SHAANXI SHAANXI COAL HANCHENG MINING CO LTD +1

Vector map reversible information hiding method

The invention provides a vector map reversible information hiding method. The method comprises steps that a vertex coordinate is acquired, a reference vertex is selected; quantification step is calculated; watermarking embedding is carried out; watermarking extraction and lossless recovery are carried out. Through the method, according to the reference vertex and precision error tolerance of a vector map, embedding parameters are set, the normalization quantification step is calculated, the reference vertex and a line of each vertex are quantified, the position of each vertex in a quantification section is changed to realize watermarking embedding, disturbance of watermarking embedding on the vector map can be effectively controlled, robustness on rotation, uniform zoom and translation operation is realized, on the other hand, the method can realize lossless recovery of the original data of the vector map after watermarking extraction, and the vector map can be guaranteed to be precisely used.
Owner:XUZHOU NORMAL UNIVERSITY

Reversible information hiding method capable of keeping direction relation for vector maps

ActiveCN105427232AMaintain directional relationshipEasy to useImage data processing detailsError toleranceWatermark embedding
The invention provides a reversible information hiding method capable of keeping direction relation for vector maps. The reversible information hiding method comprises the following steps: acquiring vertex coordinates; ordering the vertex coordinates; segmenting the ordered coordinates; calculating borders of the obtained segments; acquiring an extension coordinate sequence of the segments, and embedding watermarks; acquiring the sequence of ordered coordinates containing the watermarks; acquiring the coordinates containing the watermarks; and extracting the watermarks, and carrying out non-destructive recovery. According to the method, vertex coordinates of all coordinate axes are ordered and segmented, embedding capacity is expanded via the boundary coordinates of the segments, embedding parameters are set according to the precision error tolerance of the vector maps, and the relative positions of the vertex coordinates of all the coordinate axes are not changed during watermark embedding by setting a watermark embedding condition, so that the invisibility is relatively high while the original direction relation of the vector maps is kept; moreover, after watermark extraction, initial data of the vector maps are recovered in a non-destructive manner, so that the accurate use of the vector maps can be effectively ensured.
Owner:XUZHOU NORMAL UNIVERSITY

Rapid construction smooth blasting method for half-section micro-step

The invention relates to the technical field of tunnel engineering, and discloses a rapid construction smooth blasting method for a half-section micro-step. The rapid construction smooth blasting method comprises the following steps that a constructor formulates an excavation scheme according to surrounding rock conditions, and peripheral holes and auxiliary holes are formed by using an excavationdrilling trolley according to the excavation scheme. According to the rapid construction smooth blasting method for the half-section micro-step, multiple groups of slotting holes are formed, wedge-shaped slotting, multiple wedge-shaped slotting or straight hole layered slotting or spiral slotting is adopted for the slotting holes, and under the condition that the number of detonator sections is enough, part of rock mass at the slotting part should be blasted, so that slotting is easy to take out, the slotting effect can be guaranteed, the single-section dosage of slotting can be reduced, andthe vibration reduction effect can also be guaranteed; and by the adoption of the non-electric millisecond-level or semi-non-electric millimeter-level delay detonators and the detonating cords, the time difference requirement, namely the shock absorption requirement, can be met, meanwhile, operation is convenient, and stability is high.
Owner:高军

Integral Hoisting Method of Large-span Spherical Grid Frame

The invention discloses a method for overall hoisting of a large-span spherical grid frame. The invention adopts a combination of overall hoisting and segmental hoisting to hoist a large-span spherical grid frame. Overall assembly, the reserved value of the arching height is prepared during the assembly process, and the upper grid frame is lifted and installed as a whole through multiple lifting equipment, and the upper structure of the overall hoisting is used to form an operation platform, and the lower structure is assembled in sections , hoisting and connecting in sections to form a whole, which reduces the bulk of components at high altitudes, reduces the amount of scaffolding, and reduces the amount of high-altitude operations. The construction is safe and reliable, reduces construction risks, improves construction work efficiency, and is conducive to the quality control and maintenance of grid structures. Safety production control.
Owner:CHENGDU NO 1 CONSTR

A Reversible Information Hiding Method for Vector Maps Preserving Direction Relationship

The invention provides a reversible information hiding method capable of keeping direction relation for vector maps. The reversible information hiding method comprises the following steps: acquiring vertex coordinates; ordering the vertex coordinates; segmenting the ordered coordinates; calculating borders of the obtained segments; acquiring an extension coordinate sequence of the segments, and embedding watermarks; acquiring the sequence of ordered coordinates containing the watermarks; acquiring the coordinates containing the watermarks; and extracting the watermarks, and carrying out non-destructive recovery. According to the method, vertex coordinates of all coordinate axes are ordered and segmented, embedding capacity is expanded via the boundary coordinates of the segments, embedding parameters are set according to the precision error tolerance of the vector maps, and the relative positions of the vertex coordinates of all the coordinate axes are not changed during watermark embedding by setting a watermark embedding condition, so that the invisibility is relatively high while the original direction relation of the vector maps is kept; moreover, after watermark extraction, initial data of the vector maps are recovered in a non-destructive manner, so that the accurate use of the vector maps can be effectively ensured.
Owner:XUZHOU NORMAL UNIVERSITY

A Marker-based Integrity Authentication Method for Vector Maps

The invention provides a mark based vector map completeness authentication method. The method comprises the following steps: identifying vertex coordinates of an embeddable watermark; adaptively dividing map element groups; generating an authentication watermark; embedding the authentication watermark; marking map elements; and performing watermark authentication and original data lossless restoration. According to the method, the map elements of a vector map are adaptively divided into different groups, the authentication watermark is embedded with a reversible information hiding method on the premise of considering a precision error margin of the vector map, and based on a vertex insertion method, a mark is added into each map element to indicate the map element group that the map element belongs to, so that correct division of the map element groups in a watermark authentication stage is ensured, the invisibility is relatively high while the map elements are accurately positioned and tampered, and the map element disordering and the vertex reversed attack can be tolerated; and in addition, through an algorithm, in the watermark authentication stage, the marks are removed, the authentication watermark is extracted, and original data of the vector map are losslessly restored, so that accurate use of vector map data can be effectively ensured.
Owner:徐州市神山智能科技有限公司

Vector map integrity authentication method for positioning tampered area

The invention provides a vector map integrity authentication method for positioning a tampered area. The method comprises the steps of classifying primitive vertexes, dividing data units based on the simulated annealing method, associating the primitive vertexes with the data units, constructing the positioning information, generating an authentication watermark, embedding the positioning information and the authentication watermark, marking primitives, conducting the watermark authentication and positioning the tampered area. According to the technical scheme of the invention, based on the simulated annealing method, the primitives of a vector map are divided into different data units, and a mark is added into each primitive for indicating the data unit of the above primitive. An associated data unit is assigned to each data unit and then the positioning information is constructed. Meanwhile, according to the quantization-based information hiding method, the embedding of the authentication watermark and the embedding of the positioning information in the associated data unit are realized. As a result, a tampered data unit and the original area thereof are accurately positioned, and the reliable application of the vector map is ensured. Meanwhile, the rotation operation, the uniform scaling operation and the translation operation can be tolerated at the same time. The disturbance caused by the embedding of the information into the vector map can be effectively controlled, and the quality of the watermark-contained vector map is effectively controlled.
Owner:XUZHOU NORMAL UNIVERSITY

Mud pump damming integrated machine

The invention discloses a mud pump damming integrated machine. The mud pump damming integrated machine comprises an axle, an earth material storage container, an earth material conveying system, an earth material vibrating screen, a mud production device and a mud conveying pump; the earth material storage container, the earth material conveying system, the earth material vibrating screen, the mud production device and the mud conveying pump are arranged on the axle; one end of the lower portion of the earth material storage container is provided with an earth material breaking mechanism; the earth material conveying system is located under the earth material storage container; the earth material vibrating screen is located under the earth material conveying system; the mud production device is located under the earth material vibrating screen; earth materials and water which is supplied by a water supply system are mixed into mud through the mud production device; the water supply system is arranged on the lower portion of the mud production device and is communicated with the mud production device; the mud conveying pump is located in front of the mud production device and is communicated with the mud production device. According to the mud pump damming integrated machine, the problems that the water drop damming dam site selection is limited, the mud concentration cannot be controlled, the quality of a dam body is non-uniform, geological disasters such as landslides are easy to cause, working conditions of the operating personnel are poor, the labor intensity is large, and the security is difficult to guarantee are solved, the mechanization and the automation of check dam construction are achieved, and the construction quality and efficiency is improved.
Owner:陕西省水土保持局

Super early receiving supporting structure of shield machine and super early receiving method

The invention relates to a super early receiving supporting structure of a shield machine and a super early receiving method. The super early receiving supporting structure is characterized by comprising a receiving well foundation pit wall support, a bottom plate support and an outlet hole support, wherein the receiving well foundation pit wall support comprises a foundation pit envelope pile, at least two anchor cables and a steel pipe corner support; the outlet hole support is a temporary horizontal support; and the bottom plate support comprises an anti-pulling pile and a concrete bottom plate paved on a foundation pit bottom soil mass. By the super early receiving supporting structure and the super early receiving method, the construction problem that the shield machine cannot be received in advance when the shield machine arrives at a station in advance is successfully solved, the service life of the shield machine is prolonged, the construction cost of a shield interval is saved, and the construction period is shortened. The structure and the method can be applied to the advanced receiving of the shield machine when a receiving well structure is not completely constructed or finished.
Owner:北京城乡建设集团有限责任公司

A Vector Map Integrity Authentication Method for Locating Tampered Areas

The invention provides a vector map integrity authentication method for positioning a tampered area. The method comprises the steps of classifying primitive vertexes, dividing data units based on the simulated annealing method, associating the primitive vertexes with the data units, constructing the positioning information, generating an authentication watermark, embedding the positioning information and the authentication watermark, marking primitives, conducting the watermark authentication and positioning the tampered area. According to the technical scheme of the invention, based on the simulated annealing method, the primitives of a vector map are divided into different data units, and a mark is added into each primitive for indicating the data unit of the above primitive. An associated data unit is assigned to each data unit and then the positioning information is constructed. Meanwhile, according to the quantization-based information hiding method, the embedding of the authentication watermark and the embedding of the positioning information in the associated data unit are realized. As a result, a tampered data unit and the original area thereof are accurately positioned, and the reliable application of the vector map is ensured. Meanwhile, the rotation operation, the uniform scaling operation and the translation operation can be tolerated at the same time. The disturbance caused by the embedding of the information into the vector map can be effectively controlled, and the quality of the watermark-contained vector map is effectively controlled.
Owner:XUZHOU NORMAL UNIVERSITY

Ultra-large silo prestress tension process method

The invention discloses an ultra-large silo prestress tension process method. The method comprises the following steps that a hole channel is formed in a buttress column of a silo; jack oil pressure gauge readings corresponding to the tension anchor control force, and the extension amount of each jack piston are solved; penetrating of a steel strand is carried out; a first buttress column 1, a third buttress column 3 and a fifth buttress column are subjected to graded tension through two jacks from top to bottom, and a second buttress column 2, a fourth buttress column 4 and a sixth buttress column 6 are subjected to graded tension through two jacks from bottom to top; hole channel grouting is carried out; pilasters are subjected to anchor sealing; and concrete is cured and end forms are removed.
Owner:MCC5 GROUP CORP SHANGHAI
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products