Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

44 results about "Requirements determination" patented technology

Requirements determination and requirements structuring are two core components of system analysis. Traditionally, interviewing, questionnaires, directly observing and analyzing documents are four main methods adopted by system analysts to collect information. ... Requirements determination is the beginning sub phase of analysis. In this sub phase, analysts should gather information on what the system should do from as many sources as possible.

Mobile terminal, access control management device, and access control management method

A mobile terminal (200) comprises an application execution unit (240) configured to execute an application program; an access control rule management unit (270) configured to retain an access control rule defining whether the application program has an access authorization to a confidential resource in the mobile terminal and a determining unit; an access control rule query unit (220) configured to acquire, from an external device, the access control rule by designating at least one of an identifier of a user identity module installed in the mobile terminal and an identifier of the mobile terminal, and to retain the acquired access control rule in the access control management unit; a query requirement determination unit (260) configured to determine whether to update the access control rule when the application program makes an access to the confidential resource, and to update the access control rule; an authorization management unit (230) configured to determine whether the application program has the access authorization based on the access control rule; and a confidential resource management unit (250) configured to determine whether to permit an access request to the confidential resource by the application program, based on a result of the determination of the authorization management unit (230).
Owner:NTT DOCOMO INC

Breeding support system

A breeding support system including at least one information terminal for processing breeding information associated with breeding work of at least one individual breeding object, the system comprising: individual information collecting means for collecting individual information indicating a time-variable change of an individual condition of the individual breeding object; specified breeding work requirement determination means for determining a requirement for a specified breeding work from among all breeding work in accordance with a profile of the time-variable change of the individual condition; breeding guidance generation means for generating at least one breeding guidance announcing a requirement of the specified breeding work determined; and breeding guidance supply means for supplying the generated breeding guidance as the breeding information to the information terminal.
Owner:LAPIS SEMICON CO LTD

Method and arrangement for the energy-saving operation of dishwashers

The energy-saving operation of dishwashers (110; 410) plays an important role, in particular for larger enterprises, e.g. for the canteens of hospitals or large enterprises, and in the medical disinfection field. The invention thus discloses a method and a device, in which a total maximum electric output is assigned to a group of electric consumer elements (14, 15, 18, 19, 22, 23, 26, 33; 418, 420, 432, 438) of a dishwasher (110; 410). In addition, at least two output levels are assigned to each electric consumer element (14, 15, 18, 19, 22, 23, 26, 33; 418, 420, 432, 438) of said group. An optimum combination of output levels is then selected in a requirement determination step, based on an operational state B of the dishwasher (119), whereby for each consumer element (14, 15, 18, 19, 22, 23, 26, 33; 418, 420, 432, 438) the selected output level is adapted to the output requirement of the consumer element (14, 15, 18, 19, 22, 23, 26, 33; 418, 420, 432, 438) in operational state B and the total output of all consumer elements (14, 15, 18, 19, 22, 23, 26, 33; 418, 420, 432, 438) does not exceed the maximum electric total output. The operation of the dishwasher (110; 410) can also be divided into three phases, a start phase, an activation phase and a load control phase. The output levels of the individual consumer elements (14, 15, 18, 19, 22, 23, 26, 33; 418, 420, 432, 438) are optimally adapted in accordance with the requirements in said operating phases, thus allowing a response to be made to any fluctuations in the operational state. The inventive method permits significant energy savings to be made in comparison to conventional methods for controlling dishwashers (110; 410) and leads to a more rapid attainment of a ready status of the dishwasher (110; 410) upon activation.
Owner:MEIKO MASCHENBAU

Mobile terminal, access control management device, and access control management method

A mobile terminal (200) comprises an application execution unit (240) configured to execute an application program; an access control rule management unit (270) configured to retain an access control rule defining whether the application program has an access authorization to a confidential resource in the mobile terminal and a determining unit; an access control rule query unit (220) configured to acquire, from an external device, the access control rule by designating at least one of an identifier of a user identity module installed in the mobile terminal and an identifier of the mobile terminal, and to retain the acquired access control rule in the access control management unit; a query requirement determination unit (260) configured to determine whether to update the access control rule when the application program makes an access to the confidential resource, and to update the access control rule; an authorization management unit (230) configured to determine whether the application program has the access authorization based on the access control rule; and a confidential resource management unit (250) configured to determine whether to permit an access request to the confidential resource by the application program, based on a result of the determination of the authorization management unit (230).
Owner:NTT DOCOMO INC

Power capacity allocation method of grid-connected microgrid

ActiveCN106655248AImprove economyTaking into account the ability of self-power supplySingle network parallel feeding arrangementsWind energy generationUtility theoryMicrogrid
The invention discloses a power capacity allocation method of a grid-connected microgrid. The method comprises the steps of (A) building a wind turbine model, a photovoltaic cell model and a storage battery model in the grid-connected microgrid; (B) building a capacity design optimization objective function model, wherein a capacity design optimization objective function comprises annual average composite cost C<ACT> and a self-equilibrium coefficient SSR; (C) solving the capacity design optimization objective function by using a stochastic simulation-based NSGA-II algorithm to obtain a pareto frontier; and (D) selecting a preferred plan meeting the design requirements from the pareto frontier by using a utility theory. According to the power capacity allocation method, the economy and the self-powered capability are taken into account while the wind and light output uncertainty is considered, and the optimum numbers of wind turbines, photovoltaic cells and storage batteries can be determined according to the design requirements.
Owner:POWERCHINA ZHONGNAN ENG

Thermal power generation unit real-time dispatching requirement determination method considering maximum new energy utilization

ActiveCN105896616AFully explore the adjustment abilitySufficient adjustment spaceSingle network parallel feeding arrangementsAutomatic controlFully developed
The invention relates to a thermal power generation unit real-time dispatching requirement determination method considering maximum new energy utilization, and belongs to the technical field of operation and control of a new energy access power system. The method comprises the steps of starting data acquisition for one time at the current moment; calculating the real-time power generation requirement of the current power grid; calculating the output regulation requirement of the current automatic control unit obtained under different conditions in real time; calculating the regulation requirement of the current call wire power obtained under different conditions in real time; and finally obtaining the real-time dispatching requirement of the thermal power generation unit of the power system considering the maximum new energy utilization, and carrying out corresponding real-time dispatching on the thermal power generation unit of the power system under different conditions in real time. According to the method, the maximum new energy power generation utilization is taken as the target, so that the power system can arrange the thermal power generation unit output in advance according to the new energy power generation operating state and the power grid operating state in real time so as to fully develop the power grid regulation capacity and ensure that the power grid has enough regulation space to utilize the new energy.
Owner:TSINGHUA UNIV +2

Bank microservice-based software test analysis method

The invention relates to a bank microservice-based software test analysis method, which comprises the following steps of: A, dividing test analysis of a bank system into four object dimensions, namelya product scene layer, a user scene layer, a microservice layer and an interface layer, according to a product of a bank, a user group and an architecture of the bank system; b, decomposing all the functional logics of each layer into minimum units, sorting out all test points, forming father / child nodes by the test points in each layer, and then respectively establishing an element hierarchy tree; c, determining the type of a test analysis model needing to be established according to actual test requirements; d, according to the determined types of the test analysis models, nodes under the element level trees are combined in a crossed mode to form the corresponding test analysis models. According to the method, the test analysis is easier under the conditions of huge number of bank software systems and complex business logic at present, the test requirements can be comprehensively covered, and the test range can be well evaluated.
Owner:SICHUAN XW BANK CO LTD

Method of automatic generation of internet-of-things data process flow based on RFID (radio frequency identification)

The invention relates to a method of automatic generation of internet-of-things data process flow based on RFID (radio frequency identification). The method manly includes the steps of firstly, allowing for man-machine interaction to generate RFID data process flow, determining the required process according to needs, finally determining atomic processes of data processing, and sorting the atomic processes to obtain an atomic process sequence, configuring the number of the atomic processes according to resource conditions, and correlating the process to obtain a complete data process flow chart; secondly, automatically generating basic constraint conditions, automatically generating three constraint conditions, including cross-process item number constraint, item inclusion relation constraint and cross-process timing constraint, according to the generated data process flow chart; and thirdly, checking data completeness, namely checking the completeness of RFID data in real time, and sending out alarm in case of checked anomaly.
Owner:UNIV OF ELECTRONIC SCI & TECH OF CHINA

Working shape prediction method, working requirement determination method, working method, working system, method of manufacturing semiconductor device, computer program, and computer program storage medium

ActiveUS7686673B2Simple and accurate predictionSimple and accurate determinationEdge grinding machinesSemiconductor/solid-state device testing/measurementEngineeringMechanical engineering
The relationship between polishing conditions constituting elements and the worked shape (amount of polishing) obtained by way of these polishing conditions is input beforehand into polishing condition determining mechanism along with the type of the object of polishing, and polishing conditions (invariable polishing conditions) that are used in common for the polishing of this object of polishing. The polishing condition determining mechanism determines the polishing conditions on the basis of these conditions. Specifically, the above-mentioned polishing conditions constituting elements are given in a time series, or combinations of the above-mentioned polishing conditions constituting elements are converted into variations in the swinging velocity of the polishing body, and the swinging velocity corresponding to the swinging position is determined. The polishing apparatus control mechanism input the polishing conditions determined by the polishing condition determining mechanism, and control the polishing apparatus so that these polishing conditions are realized. As a result, working conditions for obtaining a specified worked shape in a working apparatus can be simply and accurately determined.
Owner:NIKON CORP

Working shape prediction method, working requirement determination method, working method, working system, method of manufacturing semiconductor device, computer program, and computer program storage medium

The relationship between polishing conditions constituting elements and the worked shape (amount of polishing) obtained by means of these polishing conditions is input beforehand into polishing condition determining means along with the type of the object of polishing, and polishing conditions (invariable polishing conditions) that are used in common for the polishing of this object of polishing. The polishing condition determining means determine the polishing conditions on the basis of these conditions. Specifically, the above-mentioned polishing conditions constituting elements are given in a time series, or combinations of the above-mentioned polishing conditions constituting elements are converted into variations in the swinging velocity of the polishing body, and the swinging velocity corresponding to the swinging position is determined. The polishing apparatus control means input the polishing conditions determined by the polishing condition determining means, and control the polishing apparatus so that these polishing conditions are realized. As a result, working conditions for obtaining a specified worked shape in a working apparatus can be simply and accurately determined.
Owner:NIKON CORP

Quality of service in wireless backhauls

A feeder terminal comprises backhaul communication circuitry to connect to a communications network via a wireless backhaul, and provide an access base station with access to the wireless backhaul. Backhaul information circuitry determines congestion information relating to the wireless backhaul and communication circuitry enables communication with an access base station and provides the congestion information to the access base station. In response to a demand message from the access base station comprising quality of service requirements, the communication circuitry forwards the demand message to the communications network. Additionally, an access base station comprises communication circuitry to enable communication with a feeder terminal. Backhaul communication circuitry connects to acommunications network via a wireless backhaul provided by the feeder terminal, and provides the user equipment with access to the wireless backhaul. Requirement determination circuitry determines atleast one quality of service requirement from the user equipment; and access control circuitry selectively controls usage of the wireless backhaul by the user equipment. The communication circuitry provides a quality of service demand message to the feeder terminal based on the at least one quality of service requirement and receives congestion information relating to the wireless backhaul from the feeder terminal. The access control circuitry controls usage of the wireless backhaul by the user equipment in dependence on the congestion information.
Owner:AIRSPAN NETWORKS INC PTSGE CORP

Power interchange control device, power interchange control method, and power interchange control system

The present invention is an energy management system (101) for an electric power consumer that maintains a distributed power supply, wherein the power management system (101) is provided with: an interchange request preparation unit (201) for preparing an interchange request that includes an interchange request amount; an interchange requirement determination unit (202) for calculating an interchange requirement on the basis of the interchange request amount; a transceiver (103) for transmitting the interchange request amount and the interchange requirement to another energy management system;an interchange negotiation counterpart determination unit (203) for determining an interchange negotiation counterpart on the basis of the received interchange requirement; an interchange response determination unit (204) for calculating a possible interchange amount for each negotiation counterpart on the basis of the received interchange request amount, and transmitting the possible interchangeamount via the transceiver (103); and an interchange plan determination unit (205) for determining an interchange plan on the basis of the received possible interchange amount and the interchange request amount of the host unit.
Owner:MITSUBISHI ELECTRIC CORP

Design method of super-resolution imaging system

ActiveCN109683343AAchieve decouplingTake full advantage of super-resolution imagingOptical elementsSignal-to-quantization-noise ratioImage sequence
The invention discloses a design method of a super-resolution imaging system, which comprises the following steps: firstly, selecting a detector in the super-resolution imaging system, determining a pixel size p, and obtaining a focal length f of an optical lens; determining the performance factor Eta of improvement of the multiple of the super-resolution imaging system according to the requirements, wherein the improvement of the multiple is shown in the description, and obtaining the F# number of the optical lens in the super-resolution imaging system; calculating to obtain the imaging signal-to-noise ratio SNR of the super-resolution imaging system, and checking whether or not the F# number meets the requirement of the imaging signal-to-noise ratio index; if the index requirement is met, obtaining the aperture D of the optical lens in the super-resolution imaging system, and further obtaining the design parameters of the optical lens; using the super-resolution imaging system for observing a target to be detected for a plurality of times and forming an image sequence yk of the target to be detected; substituting the image sequence yk into a super-resolution reconstruction equation, and solving the super-resolution reconstruction equation according to the minimum relative entropy to obtain a super-resolution imaging result. The design method of the super-resolution imaging system can make the system give full play to the advantages of super-resolution imaging, thereby achieving system-level optimization design.
Owner:ACAD OF OPTO ELECTRONICS CHINESE ACAD OF SCI
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products