The invention provides a novel
building construction site garbage
pool, relates to the technical field of garbage treatment, and solves the problems that when a cover plate is opened through structural improvement, the
solid-liquid separation efficiency cannot be improved, synchronous cleaning of a drainage
pipe filter screen cannot be synchronously achieved, elastic looseness prevention of a ground nail cannot be achieved through structural improvement, and pulling convenience of the ground nail cannot be improved through structural improvement in the prior art are solved. The novel
building construction site garbage
pool comprises a box body. A cover plate is connected to the box body in a sliding mode, and a containing box is placed in the box body. A cylindrical rod is welded on a stress plate, and a cleaning
brush seat is welded at the
tail end of the cylindrical rod. Two cleaning brushes are welded on the cleaning
brush seat, the two cleaning brushes are in contact with the filter screen on a drainage
pipe, and the distance between the two cleaning brushes is equal to the
radius of a bulge, so that the filter screen can be cleaned through the cleaning brushes in the
reciprocating motion process of the stress plate.