Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

142 results about "Performance objective" patented technology

Performance objectives are targets that individuals set on a quarterly, semi-annual or yearly basis. Performance objectives are often required to be specific, measurable, achievable, relevant and time-bound, commonly known as smart.

Method for integrating flow orchestration and scheduling for a batch of workflows

Techniques for executing a batch of one or more workflows on one or more domains are provided. The techniques include receiving a request for workflow execution, sending at least one of one or more individual jobs in each workflow and dependency information to a scheduler, computing, by the scheduler, one or more outputs, wherein the one or more outputs are based on one or more performance objectives, and integrating orchestration of one or more workflows and scheduling of at least one of one or more jobs and one or more data transfers, wherein the integrating is used to execute a batch of one or more workflows based on at least one of one or more outputs of the scheduler, static information and run-time information.
Owner:IBM CORP

Control system for wind turbine

InactiveUS20080086281A1Maximize its energy outputMaintaining design lifeWind motor controlEngine fuctionsHorizonControl system
A control system for a wind turbine comprises: a sensor arrangement for capturing measures related to the turbine operation and fatigue accumulation; an upper level controller, which, on the basis of a statistical treatment of said measures, calculates optimized control settings at discrete points of time; a measurement module which processes said measures into instantaneous values; and a lower level controller that receives said control settings and said instantaneous values and calculates instantaneous optimal commands to control turbine actuators. The lower level controller comprises a continuous-time damage model which calculates the rate at which damage is accumulated at any time, and an optimal controller which controls operational states of the turbine, either by directly giving feedback of the instantaneous values to the actuators, or by generating a turbine performance objective function which is continuously optimized by repeatedly solving a receding horizon optimization problem.
Owner:ECOTECNIA ENERGIAS RENOVABLES +1

Method and apparatus for allocating bandwidth for a network

A method and apparatus for performing traffic engineering, e.g., allocating bandwidth, on a wireless access network are disclosed. For example, the method determines a number of subscriber stations (SSs) that a Base Station (BS) is capable of supporting in accordance with at least one performance objective for voice traffic, wherein the at least one performance objective for voice traffic comprises a type of codec. The method then allocates bandwidth by the base station in accordance with the number of subscriber stations that the base station is capable of supporting.
Owner:AMERICAN TELEPHONE & TELEGRAPH CO

Methods for augmentation and interpretation of data objects

Efficient methods for implementing security and manageability for stored data objects involve logical object reorganization, computation and injection of metadata, and specialized data access operations. Methods for utilization and incorporation of cryptographic key hierarchies and security functions for data objects are disclosed. Cryptographic keying and other data management operations may be performed for individual blocks within a data object rather than only for the entire data object in order to achieve performance objectives.
Owner:SYSXNET

Multiple resource control-advisor for management of distributed or web-based systems

A system and method are provided for autonomic system management in a computing system containing system resources including network resources and multiple resource demands, or processes. The computing system may be a stream-processing system or other real-time computer management system, such as workload management, or a virtualization engine. The system and method enables achieving a better level of performance than would occur in the computing system using only existing mechanism. It permits, with very low computational overhead, achieving or driving the system closer to a user-defined system performance objective. To do so, a system performance equation is defined to determine a level of performance of the system as a function of the allocation of two or more system resources among a plurality of system resource demands or processes. From this system performance equation, a plurality of resource-specific change equations is derived. Each resource-specific change equation is capable of calculating changes in the level of performance of the system attributable to changes in the allocation of one of the system resources. The resource-specific change equation yielding the greatest change in the level of system performance at a given allocation of all of the system resources and the system resource associated with the identified resource-specific change equation are identified. The allocation of the identified associated system resource to at least one system resource demand to provide the largest increase in the level of performance of the system, and allocations for all system resources are adjusted in accordance with the modified allocation of the identified associated system resource.
Owner:IBM CORP

Multi-objective performance-based aseismic design method of engineering structure

ActiveCN102787676AAssessing the Seismic Capacity of StructuresSeismic data acquisitionProtective buildings/sheltersElastic plasticCapacity spectrum
The invention relates to a performance-based aseismic design method. The multi-objective performance-based aseismic design method of an engineering structure includes the following steps: (1) providing performance objectives achieved by the engineering structure; (2) inputting different performance objectives into a single degree-of-freedom elastic-plastic structural system to perform simulation tests; (3) adjusting magnitude of aseismic wave continuously, determining functional relationship between the aseismic influence coefficient and the structural period when the different performance objectives are achieved, and obtaining an aseismic demand spectrum curve; (4) obtaining the relationship between shearing force and displacement of the engineering structure by using an analytical method; (5) converting the relationship between the shearing force and the displacement of the engineering structure into a functional relationship between the capacity and the displacement under the single degree-of-freedom system, and obtaining a structural capacity spectrum curve; (6) according to the structural period, comparing the relationship between the capacity spectrum curve and the aseismic demand spectrum curve, and estimating structure aseismic capability under different performance objectives. The engineering structure multi-objective performance-based aseismic design method is used for estimating aseismic performance of the engineering structure and designing aseismic construction according to the estimating results of the engineering structure.
Owner:QINGDAO TECHNOLOGICAL UNIVERSITY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products