The invention provides an installation method for integrated
prefabrication of an anchor platform and an anchor mouth. The installation method for integrated
prefabrication of the anchor platform and the anchor mouth comprises the following steps that firstly, the
structural drawing of the anchor platform and all components of the anchor platform is drawn based on
computer aided drawing, and a numerically-controlled file is generated so that a numerically-controlled forming
system can be guided to
machine components such as a panel, a
wrist plate, an annular connecting piece, a surrounding plate and a hawse
pipe; secondly, the components such as the panel, the
wrist plate, the annular connecting piece, the surrounding plate and the hawse
pipe are installed and welded, so that an organic integrity is formed; finally, the organic integrity is hoisted onto an outer plate, of a segmented structure, of a ship body to be positioned, welded and fixed. By the adoption of the installation method for integrated
prefabrication of the anchor platform and the anchor mouth, integrated installation of the components such as the anchor platform can be achieved in a one-time mode when the ship body is re-manufactured in a segmented mode, a small number of crane sources are occupied, integrated prefabrication of the anchor platform and the anchor mouth can be achieved conveniently and rapidly, manpower and
material resources are saved, and the cycle of a
slipway (dock) is shortened.