The invention discloses a pipeline side settlement prevention
system for a soft soil foundation and a construction method. The pipeline side settlement prevention
system for the soft soil foundation comprises a pipeline, a structure
pool wall, a structure bottom plate, a concrete base plate and a sand foundation, one end of the pipeline penetrates through and is fixed on the structure
pool wall, one end of the structure bottom plate extends out of the outer surface of the structure
pool wall to form an overhanging
scaffold, the concrete base plate is located under the pipeline, one end of theconcrete base plate is fixed to the overhanging
scaffold, and the sand foundation is located above the concrete base plate. The concrete base plate has certain strength and rigidity, and one end of the concrete base plate is fixed to a structure, so that differential settlement of a soft soil foundation pipeline and the structure can be coordinated by means of the strength and rigidity of the concrete base plate, and the problems of flexural
joint damage, pipeline tension fracture,
water leakage and the like caused by differential settlement of the pipeline at the joint of the pipeline and thestructure are effectively solved.