The invention discloses a rectangular anti-sliding
pile mechanical and fast hole forming construction method. The method includes the following steps that 1, industry data are prepared; 2, a construction site is prepared; 3, ground leveling is performed; 4,
staking out in survey is performed; 5, locking notch construction is performed; 6, hole drilling is performed, specifically, 6.1, a drilling
machine is put in place, and 6.2, drilling construction is performed; 7, hole checking is performed after
pile forming is finished; 8, making and lifting of a steel reinforcement cage are performed, specifically, 8.1, the steel reinforcement cage is made, and 8.2, the steel reinforcement cage is lifted; and 9, concrete pouring is performed. Drilling
machine or manual hole digging construction is replaced by hole forming construction of a trenching
machine; and through a trenching machine hole forming rectangular anti-sliding
pile construction method, the requirements of shortening the construction period are met, the project cost is reduced, and the construction safety is guaranteed. A research group implements a trenching machine hole forming rectangular anti-sliding pile construction process, that is, a novel technology of combining the trenching machine and a long-arm breaking hammer for anti-sliding pile construction is adopted, and the novel technology has the advantages of being high in applicability, fast, efficient and safe in construction and the like.