The invention discloses a method for refitting an
oil tanker into an FPSO. The method includes S1000, an establishing technology of a multipoint
mooring chain controller related structure; S2000, an establishing technology of an
oil transportation platform, S3000, an establishing technology of a
flare tower, S4000, a lifting technology of a crane upper structure, and S5000, an establishing technology of a protecting
pipe of a
seawater lift pump, wherein a symmetry
welding technology is adopted in
pipe section folding, splicing and
butt joint technologies in the above technologies, and the technologies can be constructed synchronously in parallel. By the adoption of the method for refitting the
oil tanker into the FPSO, existing
welding equipment,
lifting equipment, accuracy measurement equipment and the like are fully used, human resources with related technical capacity are scientifically dispatched, the construction efficiency is high, the construction cost is low, the
engineering quality of each subsystem meets the operation standard of an FPSO ship, the
engineering quality of the FPSO ship is effectively guaranteed, and therefore the after-sales
service time nodes of the FPSO ship are effectively prolonged.