A method for handling arching of steel cladding panels in refueling pools of nuclear power plants, which relates to the field of nuclear power plant maintenance, and the specific method includes: step S01, grouting preparation, uniformly drilling a number of grouting holes on the steel cladding panels and corresponding grouting holes Drill fixing holes on the concrete layer, and at the same time drill out the grout holes evenly. Step S02, grouting by gravity, setting a grouting pipe on the grouting hole, pouring the prepared grouting material into the grouting pipe through the grouting funnel. Step S03, grouting and plugging, placing the anchor nails welded together with the bottom of the plugging block in the fixing hole, and the plugging block is fixed at the grouting hole and the grouting hole by spot welding. Step S04, the grouting is finished, and after the grouting material is solidified, the plugging block is welded to the steel cladding, and the devices except the refueling pool are removed. The invention evenly fills the gap between the steel cladding panel and the lower concrete layer due to arching, so as to ensure that the steel cladding panel is not deformed and has good sealing performance.