The invention relates to the technical field of
nuclear power, and specifically discloses a long period fuel management method of a
pressurized water reactor core. According to the method, the first cycle reactor core adopts a high leakage loading mode, wherein the high enrichment degree
assembly and the low enrichment degree
assembly in the reactor core are mutually matched and combined, and the highest enrichment degree fuel
assembly is placed on the outermost circle of the reactor core; and in the subsequent cycle, the reactor core adopts a
low leakage loading mode, wherein the new fuel assemblies updated every time are placed inside the reactor core, and are matched with the burned-up old component, and the burned-up old component is placed on the outermost circle of the reactor core. According to the present invention, the long period fuel change design from the first cycle to the cycle balance is directly achieved, the availability and the load factor of the power
plant are increased, and the
economic benefits of the power
plant are enhanced.