The invention discloses a material lifting device for building engineering construction and using method thereof. The material lifting device for the building engineering construction comprises a baseand a transportation box, wherein supporting rods are arranged on the four corner positions of the base, a supporting table and a top plate are arranged on the upper parts and the tops of the four supporting rods correspondingly, second sliding rails are arranged on two supporting rods on the same side of the four supporting rods correspondingly, first sliding rails are connected on the upper parts of the second sliding rails, the transportation box is arranged on the second sliding rails, a traction device is arranged on the top plate and is connected with the transportation box, supportingplates are arranged between the supporting table and the top plate, electric push rods are connected to one sides of the supporting plates, sliding plates are connected to one side of the electric push rod, and the side walls of the sliding plates are fixedly connected with the first sliding rails. The material lifting device for the building engineering construction and the using method thereof are novel in structure and convenient to operate, by arranging the supporting table, the electric push rods, the sliding plates and the first sliding rails, materials can be pushed to transversely movethrough the electric push rods when conveyed to a high position, unloading of the materials is facilitated, the working efficiency is greatly improved, and the practicability of the device is improved.