121 results about "Project team" patented technology

A project team is a team whose members usually belong to different groups, have different functions and are assigned by the project manager to activities for the same project. A team can be divided into sub-teams according to need. Usually project teams are only used for a defined period of time. They are disbanded after the project is deemed complete. Due to the nature of the specific formation and disbandment, project teams are usually in organizations.

Computer-implemented automated building design and modeling and project cost estimation and scheduling system

A computer-implemented automated building design and modeling and construction project cost estimating and scheduling system (“DMES system”) is described. The DMES system provides a central source for all of the design and construction information for a construction project in a coordinated two-dimensional and three-dimensional spatial database that is freely accessible by all of the members of an interdisciplinary construction project team as a means to produce automatically coordinated design development and construction document information. The DMES system acquires and stores all of the appropriate design, engineering, and construction expertise and information available for any building type for use in automatically assembling and coordinating the design, cost-estimating, and scheduling for a construction project. In one embodiment, the DMES system consists of a plurality of objects, comprising elements and massing elements arranged in an assembly hierarchy. Each of the objects includes programming code that defines an interface and discrete internal functions that define its behavior. When instantiated in the database, the objects automatically create further instances of other objects in the hierarchy, which in turn do the same, thus assembling a complete building model automatically from the initial manually-placed instance. The building model enables automatic generation of drawings and cost and scheduling information. By running automatic iterations of the building model, multiple designs may be evaluated to determine the optimum design.
Owner:BECK TECH

Integrated business system for the design, execution, and management of projects

The system of method for building a database for the design and execution of projects is described. This system includes a host computer system in data communication with a central database and at least first and second databases. The central data base stores information relating to the design and execution of the project predetermined to be important to one or more project team members. The first and second databases are in communication with first and second computer systems which may be remotely located from each other and which execute standard industry software tools. The host computer system is configured to monitor a plurality of transactions to the first database. Each of the plurality of transactions stores data in the first database. The monitoring includes comparing the plurality of a transaction against a predetermined transaction. If the host computer detects a match between one of the plurality of transactions and the predetermined transaction, the host computer reads the first data stored in the first database by the matched transaction and stores the first data in either the second database or the central database, or both. Additionally, the host computer system generates a message indicating that the first database was updated with the first data. This message is then transmitted to the second computer system.
Owner:IBM CORP

System and method for managing communications and collaboration among team members

A system and method is adapted to utilize the Internet as a medium for providing information and data management and sharing between diverse project team members. The project team members may be part of diverse functional organizations within one or more larger organizations, may be geographically separated, or may utilize differing information management tools to perform their work activities. Each team may have its own organization separate from the organization from which the team members are drawn. Moreover, the information and data may be financial, technical, marketing and the like.
Owner:FORD MOTOR CO

Online monitoring and fault diagnosis system of large wind turbine units

The invention discloses an online monitoring and fault diagnosis system of large wind turbine units. A sensor and data collection equipment are installed on a wind turbine unit to be detected, so as to collect equipment operation state characteristic signals, such as video signals, noise signals, flame signals, electric signals, vibration signals and pressure signals, of the wind turbine unit, and transmits the state characteristic signals to a central control room of a wind power plant through a network in real time; and operation and maintenance personnel can know the operation state of the wind turbine unit at any time in the central control room of the wind power plant, and can directly analyze signal data of the abnormally operated wind turbine unit, so that operation conditions of gear boxes, main shafts, generators, bearings, hydraulic systems, yaw systems, bearing lubricating systems, brake systems, blades and towers of all units in the wind power plant are monitored in real time and failure warning information is output. Data can also be transmitted to a remote fault diagnosis center through a network, a project team performs professional analysis to faults and issues a diagnosis report, and a field maintenance team performs corresponding repair / maintenance operation.
Owner:内蒙古航天亿久科技发展有限责任公司

Method and System for Automated Construction of Project Teams

A method embodied as a web application that enables the automated construction of project teams from profiles contained in data sources accessible through the World Wide Web. The data sources may include social networks, blogs, web pages, and postings on online discussion forums. The locations of these data sources are supplied by a system administrator (during configuration and maintenance) and by registered users of the web application. The web application allows the system administrator to create a set of templates describing the kinds of roles and skills required by the users of the web application. The web application identifies potential team members referenced in the information sources and constructs a semantic network describing the skill sets and team suitability of those potential team members. The web application allows a registered user to enter the roles and capabilities required for a project team they wish to create. Once the user has entered a description of their desired project team, the application automatically constructs candidate teams by analyzing the semantic network to identify appropriate candidate teams given constraints on roles and skills. Four methods for identifying teams from the semantic network are provided. The system then provides the user with a set of recommended team members. In an iterative process, the user adjusts constraints on the team member capabilities until a satisfactory team is identified. The web application allows the user to negotiate compensation with the selected team, and provides a web-based collaboration page that the user and team may use for communication and coordination.
Owner:EARL CHARLES CALVIN +3

Build and operate program process framework and execution

Frameworks and methods for executing large-scale build and operate programs, such as sporting events, and particularly an Olympic Games. A framework of interlinked build, operate, and management processes is formed in accordance with the program requirements, which are specified in terms of deliverable products or service levels. Links between individual processes can only be traversed when exit criteria are satisfied. Methodologies are described that can be used to determine the exit criteria. Once a framework is established, a schedule control plan, by way of significant milestones, is determined. The milestones are chosen to correspond with links between processes that span process streams or project teams.
Owner:IBM CORP

Web-based three-dimensional scenic visualized editing device and method

ActiveCN102413164AComplete efficientlyReduce the risk of collaborative developmentTransmissionImage data processingGraphicsComputer terminal
The invention relates to a web-based three-dimensional scenic visualized editing device, and particularly relates to a device and method for transmitting and editing data in parallel. The device comprises a server end and a client end, wherein the server end comprises a scenic data transmission device, a version managing device and a priority managing device, and the client end comprises a dynamic display managing device. Due to the adoption of the device and the method, based on a browser thin client, a three-dimensional graph editing user can carry out the high efficient parallel development of a large-sized three-dimensional scenic project, work duplicate of the project is unnecessary to store on a user terminal computer, all three-dimensional graph design functions are supported by a central server, the centralized management of distributed data can be realized, version control can be realized for the editing operation of the user, the current operation can be rolled back by the user to a designated historic version, so the cooperative development risk of a project team can be reduced. The invention also provides a method by utilizing the device to perform multi-user cooperative edition.
Owner:北京华电万通科技有限公司

Construction project management system/method, computer readable storage medium and terminal

The invention provides a construction project management system/method, a computer readable storage medium and a terminal. The management system comprises a reminding item management module which receives the checking instruction of a reminding item and checks the item content of the reminding item; a team information management module which receives the checking instruction of a project team and checks project team information of the construction project; and a prefabrication management module which searches first level component information of the construction project according to a first search instruction and searches second level component information of each construction component according to a second search instruction, wherein the first level component information includes the name of each construction component forming the construction project, the identification code of each construction component and/or the management progress of each construction component, and the second level component information includes the name, the identification code, the management progress, the floor, the system and the class of the construction components. The management efficiency of the construction personnel can be enhanced and paperless management of the construction project can be realized.
Owner:SHANGHAI JIASHI (GROUP) CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products