Construction project management system/method, computer readable storage medium and terminal

A management system and management method technology, applied in the field of construction engineering application management, can solve problems such as poor experience, achieve good experience, realize paperless management, and improve management efficiency

Inactive Publication Date: 2017-09-15
SHANGHAI JIASHI (GROUP) CO LTD
View PDF7 Cites 20 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] In view of the shortcomings of the prior art described above, the purpose of the present invention is to provide a management system, method, computer-readable storage medium and terminal for construction projects, which a

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction project management system/method, computer readable storage medium and terminal
  • Construction project management system/method, computer readable storage medium and terminal

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0038] This embodiment provides a management system for a construction project, and the management system for the construction project includes:

[0039] a storage module for storing the construction model of the construction project;

[0040]The building project viewing module assigns building projects matching the user's authority according to the user's authority;

[0041] The display module receives a model display instruction of the construction project to display the construction model; the construction model includes a three-dimensional model and a model drawing of the construction project;

[0042] The reminder management module receives the viewing instruction of the reminder, searches for the content of the reminder, and displays the content of the reminder on an operation interface through the display module; the content of the reminder includes the content related to the building Project-related notifications and meetings, rectification items, and / or output value ...

Embodiment 2

[0085] This embodiment provides a management method of a construction project, the management method of the construction project includes the following steps:

[0086] storing an architectural model of said architectural project;

[0087] According to the user's authority, assign the construction project that matches the user's authority;

[0088] receiving a model display instruction of a construction project to display a three-dimensional model or drawing of the construction project;

[0089] Receive a viewing instruction for reminders, search for the content of the items related to the viewing instruction, and display the content of the items on an operation interface through the display module; the reminders include notices and meetings related to construction projects, rectification items, and / or output value information for each construction project; or

[0090] Receive the viewing instruction from the project team to find the personnel information of the construction ...

Embodiment 3

[0131] This embodiment provides a terminal, including: a processor, a memory, a transceiver, a communication interface, and a system bus; the memory and the communication interface are connected to the processor and the transceiver through the system bus to complete mutual communication, and the memory is used to store computer The program, the communication interface are used to communicate with other devices, the processor and the transceiver are used to run the computer program, and the terminal executes all the steps in the intelligent management method for the construction project as described above.

[0132] The system bus mentioned above may be a Peripheral Component Interconnect (PCI for short) bus or an Extended Industry Standard Architecture (EISA for short) bus or the like. The system bus can be divided into address bus, data bus, control bus and so on. For ease of representation, only one thick line is used in the figure, but it does not mean that there is only one...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a construction project management system/method, a computer readable storage medium and a terminal. The management system comprises a reminding item management module which receives the checking instruction of a reminding item and checks the item content of the reminding item; a team information management module which receives the checking instruction of a project team and checks project team information of the construction project; and a prefabrication management module which searches first level component information of the construction project according to a first search instruction and searches second level component information of each construction component according to a second search instruction, wherein the first level component information includes the name of each construction component forming the construction project, the identification code of each construction component and/or the management progress of each construction component, and the second level component information includes the name, the identification code, the management progress, the floor, the system and the class of the construction components. The management efficiency of the construction personnel can be enhanced and paperless management of the construction project can be realized.

Description

technical field [0001] The invention belongs to the field of construction engineering application management, and relates to a management system / method, in particular to a construction project management system / method, a computer-readable storage medium and a terminal. Background technique [0002] BIM (Building Information Modeling, or Building Information Modeling) is another important computer application technology that appears in the engineering construction industry after CAD (Computer Aided Design) technology, and is triggering an unprecedented revolution in the construction industry. This technology uses digital modeling software to improve the efficiency of project design, construction and management, and brings great added value to construction companies that adopt this technology. [0003] At present, the application of BIM platform to improve design, avoid rework, use BIM for simulation, optimize construction plan and other technologies have been applied relative...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/08
CPCG06Q10/0631G06Q50/08
Inventor 黄健詹生锐邢雷兵王卓潘强苏威王峰徐雨祥
Owner SHANGHAI JIASHI (GROUP) CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products