The invention relates to the technique of prevention of geological hazards, in particular to a
debris flow prevention technique. The invention discloses a
debris flow multi-stage dissipative blockingstructure, thus damage action of a
debris flow can be lowered, and the disaster loss is relieved. According to the debris flow multi-stage dissipative blocking structure, from flowing area of the debris flow to the accumulation area, the debris flow multi-stage dissipative blocking structure is arranged in a step-by-step mode along debris flow channels from the upstream to downstream, and at leastincludes a flexible blocking net, a
pile-carrying-type grid wall and a permeable
buttress-type
gravity dam. According to the debris flow multi-stage dissipative blocking structure, according to different geological conditions, types of the debris flows and the like, the matching structure of the flexible blocking net 2, the
pile-carrying-type grid wall 3 and the permeable
buttress-type gravity bam is reasonably selected, benefits of the investment in
engineering construction can be given full play to the maximum extent, and
cost benefit optimization is achieved. The debris flow multi-stage dissipative blocking
system is very suitable for prevention of the debris flow disasters.