The invention relates to a method for mounting a
blast furnace framework structure by utilizing a transverse hoisting beam, and is characterized in that firstly, the H-shaped transverse hoisting beam is prepared, and hoisting lugs are respectively welded on an upper
flange plate and a lower
flange plate of the transverse hoisting beam; before hoisting, a component ready for hoisting is welded with a hoisting lug and is connected at the lower side of the transverse hoisting beam through a steel
wire rope; followed by, one end, being connected with the component, of the transverse hoisting beam is connected with a hook head of a 4000 t.m
tower crane by a steel
wire rope, the other end, being not connected with the component, of the transverse hoisting beam is connected with a hook head of the 4000 t.m
tower crane by a steel
wire rope and a guide chain, and the guide chain is pulled tightly; finally, the component is slowly hoisted; when the component is hoisted 100 mm away from the ground, hoisting is stopped, and the tensile force of the guide chain is adjusted, so that the transverse hoisting beam is kept horizontal, and after adjusting is finished, hoisting is continued and the component is mounted at a right position. The operation is simple; and through the transverse hoisting beam, the working
radius of the
tower crane is extended, the hoisting scope of the
tower crane is enlarged, the construction cost is reduced, and the requirement of green construction is met.