The invention relates to an online
inspection method of three-phase cross interconnected electric cable intermediate head
partial discharge. The online
inspection method of the three-phase cross interconnected electric cable intermediate head
partial discharge comprises the following steps of (1) connecting three capacitive sensors with bolts, (2) connecting the three capacitive sensors with cable cores, (3) connecting the cable cores with detecting impedance, (4) connecting three pieces of detecting impedance and the outer
skin of sensor
electric cables and connecting the three pieces of detecting impedance and the outer
skin of the sensor
electric cables with the ground, (5) connecting the three pieces of detecting impedance with protective gaps in parallel, (6) connecting the detecting impedance with bayonet nut connectors (BNC), (7) connecting the BNC connectors with a
oscilloscope, and (8) judging whether the
electric cables have
partial discharge through the
oscilloscope. The online
inspection method of the three-phase cross interconnected electric cables intermediate head partial
discharge has the advantages of being used in detection when the electric cables run online, free from influences on power supply of a circuit, enabling the capacitive sensors and the detecting impedance to be installed in a
interconnection box, only three measuring electric cables to be led out of the BNC connectors on the outer wall of the
interconnection box in measurement and the measurement to be convenient, being safe and reliable, enabling a user to observe graphic information of detection signals directly through the
oscilloscope and being capable of judging whether the electric cables have the partial
discharge.