The invention discloses a warm mix
asphalt mixture construction process effective compaction
time control method and a warm mix
asphalt mixture construction process effective compaction
time control system, which are applied to the technical field of traffic construction. Fuzzy variables and a
fuzzy set of the fuzzy variables are determined, and the fuzzy variables are divided; determining a discourse domain table according to the division result of the fuzzy variables and the corresponding relation of the fuzzy sets; constructing
fuzzy inference rules, and obtaining different fuzzy relation equations according to different
fuzzy inference rules; and obtaining an output value according to the
fuzzy vector value in combination with different fuzzy relation equations, and determining an accurate value through a
defuzzification method. According to the fuzzy
analysis method for the effective compaction time of the
asphalt mixture, the requirement of
surface layer construction can be basically met, and especially when the
air temperature is lower than 20 DEG C or other environment conditions are severe, prediction of the effective compaction time of the asphalt mixture has important significance. And when the environmental condition is better and the
surface layer is thicker, the compaction time of the asphalt mixture can meet the requirement of normal rolling work.