The invention belongs to the field of
basement structure demolition and renovation, and particularly relates to a construction method for a
basement pile foundation with high
water level. The construction method sequentially comprises the following steps of pre-construction preparation, floor reinforcement, hole opening, sleeve placement,
pile forming construction and sleeve
recovery. The method has at least the following advantages that a water
drill is adopted to opening holes for floor opening, so that the
noise pollution and the
dust pollution are reduced; a sleeve is used for drainage, sothat the
pollution generated by mud to an existing
basement structure in the traditional
pile repairing construction is avoided; mud generated by the pile repairing construction is treated through amud-water
separation system and then transported out of a factory, so that the treatment efficiency is improved, and the
pollution to the environment is reduced; generated
construction waste is smalland is treated in a centralized clearing and transportation mode, so that the cleanliness of a construction site is guaranteed; and continuous
precipitation is avoided, underground
water resources areprotected, and the influence on the surrounding environment is reduced at the same time.