Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

32results about How to "Improve the rationality of distribution" patented technology

Method and system for assigning review tasks automatically

ActiveCN106910007ATake advantage ofOptimizing Allocation ResultsResourcesProgram planningResource information
The invention reveals a method and a system for assigning review tasks automatically. The system comprises: a database obtaining module, an expert information arranging module, a task assigning scheme automatically generating module, and a task assigning scheme determining module. The database obtaining module is used to obtain a review plan and a resource information database. The expert information arranging module is used to arrange expert information. The task assigning scheme automatically generating module is used to automatically generate a task assigning scheme. The task assigning scheme determining module is used to determine the task assigning scheme. The method and the system for assigning review tasks automatically proposed by the invention are capable of increasing the assigning efficiency and the assigning reasonability. The method and the system, in consideration of the technical background and technical specialties, calculate the matching degree between the review work and the responsible person. Compared with the method relying purely on the human subjective factors, the method and the system focus more on objective details, therefore, optimizing the assigning result for assigning tasks.
Owner:上海爱韦讯信息技术股份有限公司

Meal taking grid distribution method and device and storage medium

The invention discloses a meal taking grid distribution method and device and a storage medium. The meal taking grid distribution method comprises the steps: acquiring grid occupation information of adesignated grid in a meal taking cabinet of a restaurant and target order information for ordering the restaurant in a meal ordering system, wherein the grid is used for storing target food corresponding to the target order information; determining a first idle grid set in an idle state according to the grid occupation information, the to-be-taken food being not placed in each grid in the first idle grid set; obtaining height information of an extraction object of the target food to be extracted according to the target order information; determining a target grid from the first idle grid setaccording to the height information; and distributing the target grid as a grid for storing the target food. According to the meal taking grid distribution method, the technical problem of poor distribution rationality of the meal taking grids is solved.
Owner:SHANGHAI MININGLAMP ARTIFICIAL INTELLIGENCE GRP CO LTD

Construction method of intelligent module of manufacturing system, manufacturing system and manufacturing method

The invention discloses a construction method of an intelligent module of a manufacturing system, wherein the manufacturing system comprises a plurality of production equipment, and each production equipment is provided with the intelligent module; the construction method of the intelligent module comprises the following steps of S1, configuring corresponding embedded microprocessors according todifferent production equipment; S2, establishing the adaptation layer of the module based on the motion information and the state information of each production equipment; S3, extracting correspondingstate information and external interaction information according to the adaptation layer, and constructing an intelligent analysis layer of the module; S4, establishing an information interaction machine of the intelligent module according to the organizational relationship among the modules; and S5, enabling the constructed adaptation layer, the intelligent analysis layer and the information interaction mechanism to be written into the embedded microprocessor. The intelligent module construction method is applied to different production equipment, so that production difficulty caused by "multiple varieties, small batch and variable processes" in the production process in a discrete workshop are overcome, so that the production allocation reasonability is improved, the manual operation isreduced, and the efficiency and the reliability are improved.
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS +1

Traffic prediction method and device, model training method and device, electronic equipment and storage medium

The embodiment of the invention discloses a traffic prediction method and device, a model training method and device, electronic equipment and a storage medium, and the method comprises the steps: obtaining a test traffic data set which comprises the traffic data of a target object in a first preset historical time period, and inputting the test traffic data set into a pre-trained traffic prediction model, and outputting a target traffic prediction result of the target object in a specified time period, the traffic prediction model being obtained by training a prediction network based on the training traffic data set, the prediction network is obtained by integrating and constructing a full connection layer of the convolutional neural network and a full connection layer of the convolutional recurrent neural network. According to the technical scheme of the embodiment of the invention, the traffic prediction scheme is greatly optimized, and the accuracy of traffic prediction is improved.
Owner:CHINA TELECOM CORP LTD

Wireless resource adaptive distribution method and device

InactiveCN103517440AIncrease hardware costImprove the rationality of resource allocationWireless communicationSelf adaptiveTelecommunications
The invention discloses a wireless resource adaptive distribution method and device. The method comprises calculating wireless communication quality parameters of terminals in a real-time manner, and determining, based on the wireless communication quality parameters of the terminals, the wireless resource quantity needed by the terminals and distributing wireless resources to the terminals. According to the scheme, wireless communication quality parameters of all terminals can be calculated in a real-time manner, wireless resources can be distributed reasonably for different resource demands of different terminals, and the reasonable resource distribution degree and the resource utilization rate can be improved under a condition that the conversation quality of users is guaranteed and the cost of hardware is not increased.
Owner:ZTE CORP

Charging pile distribution method and related equipment thereof

The invention discloses a charging pile distribution method and related equipment, and the method comprises the steps: obtaining the current state data of at least one target vehicle and the current charging data of at least one target charging pile; firstly, inputting current state data of at least one target vehicle and current charging data of at least one target charging pile into a reinforcement learning model, and obtaining a charging pile distribution result output by the reinforcement learning model is obtained, wherein the charging pile distribution result can represent a matching relationship between at least one target vehicle and at least one target charging pile; and obtaining a charging feedback result of the at least one target vehicle, updating the reinforcement learning model according to the charging feedback result of the at least one target vehicle, and returning to execute the steps of obtaining the current state data of the at least one target vehicle and the current charging data of the at least one target charging pile and performing subsequent steps, until a preset stop condition is reached. Therefore, the distribution rationality of the charging piles canbe effectively improved.
Owner:NEUSOFT REACH AUTOMOBILE TECH (SHENYANG) CO LTD

Police officer deployment and control method, device and equipment and storage medium

The embodiment of the invention discloses a police officer deployment and control method, a device and equipment and a storage medium, relates to the technical field of data processing, and aims to reasonably determine a plurality of deployment and control positions and the number and equipment of police officers at each deployment and control position within the occurrence time of a major event. The method comprises the following steps: a server side obtains a plurality of alarm records in a preset period before the occurrence time of a major event from an alarm subsystem, determines a target key person in the plurality of alarm records, and predicts the movement track of the target key person in the occurrence time of the major event; then, the server side matches the predicted movement track with a plurality of early warning positions generated by the three-dimensional geographic information subsystem for the major event, determines a plurality of monitoring positions and danger levels of different monitoring positions in a security plan area of the major event, and finally determines the security plan area of the major event according to the danger levels of the different monitoring positions. The number of police officers and police officer equipment at the monitoring position are distributed within the occurrence time of a major event.
Owner:CHENGDU PVIRTECH TECH

Ship loading operation system, control method and device and computer equipment

The invention relates to a ship loading operation system, a control method and device and computer equipment. The ship loading operation control method comprises the steps that a material throwing shovel of a ship loader is controlled to carry out ship loading on a target loading point in a preset working posture; and if the actual loading capacity of the target loading point is matched with the simulated loading capacity corresponding to the target loading point, the ship loader is controlled to move to the next loading point, the next loading point serves as the target loading point, the step of controlling the material throwing shovel of the ship loader to carry out ship loading on the target loading point in the preset working posture is executed again, and the total loading capacity of goods entering a cabin is matched with the simulated total loading capacity. The total simulation loading amount and the simulation loading amount of each loading point are obtained according to ship loading operation simulation of a preset loading height carried out by the material throwing shovel of the ship loader in a preset working posture. The phenomenon of uneven material distribution caused by observation is eliminated, and the distribution reasonability of the materials in the cabin is improved.
Owner:SHENHUA HUANGHUA PORT

Police deployment and control method, device, equipment and storage medium

The embodiment of the present application discloses police deployment and control methods, devices, equipment, and storage media, which relate to the field of data processing technology and aim to reasonably determine multiple deployment locations, the number of police officers and the number of police officers at each deployment location within the time of a major event. equipment. The method includes: the server obtains a plurality of alarm records from the alarm subsystem within a preset period before the occurrence of a major event, and determines the target key personnel in the multiple alarm records, and predicts that the target key personnel will be involved in the major event. The activity trajectory within the occurrence time; then the server matches the predicted activity trajectory with the multiple early warning locations generated by the 3D geographic information subsystem for the major event, and determines multiple control locations in the security plan area of ​​the major event and The danger levels of different control positions, and finally, according to the danger levels of different control positions, the number of police officers and police equipment in the control position are allocated within the time of major incidents.
Owner:CHENGDU PVIRTECH TECH

Self-adaptive adjustment method and device for channel scanning time

The invention relates to a self-adaptive adjustment method and device for channel scanning time. The method comprises the following steps: acquiring a historical AP number of a channel according to ahistorical scanning result of the channel; and determining the scanning time of the channel according to the historical AP number. The scanning time of a current channel is determined according to a historical scanning result of the channel. According to the self-adaptive adjustment method and device for channel scanning time, the scanning time of the channel with a large number of APs is longer,the scanning time slice is prevented from being wasted on the channel with a small number of APs or even without APs, the distribution rationality of the channel scanning time is improved, more APs can be scanned by using less time, and the utilization of the scanning time slice is more efficient.
Owner:UNIGROUP SPREADTRUM COMM HUIZHOU CO LTD

Power load distribution method and device, computer equipment and storage medium

The invention relates to a power load distribution method and device, computer equipment and a storage medium. The method comprises the steps of obtaining a power utilization rule of a target power station in a current region within a first preset duration; generating target prediction data according to the power utilization rule in the first preset duration and the reference power utilization rule of a non-target power station in the current region in the second preset duration or the reference power utilization rule of any power station in the non-current region in the third preset duration; organizing the target prediction data to generate prediction operation data and a power distribution scheme of the target power station; and performing power distribution on the target power station according to the predicted operation data and the at least one power distribution scheme. Compared with a traditional mode of carrying out power distribution through a parameter table, the scheme utilizes the power utilization rule of the target power station and the reference power utilization rule of other power stations to predict the operation data of the target power station, and carries out power distribution on the target power station according to the predicted data, so that the effect of improving the reasonability of power load distribution is realized.
Owner:GUANGZHOU KETENG INFORMATION TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products