High-hardness large forged steel supporting roller and manufacturing method thereof
A manufacturing method and technology for supporting rolls, which are applied in the directions of manufacturing tools, furnace types, metal rolling, etc., and can solve the problems of low surface hardness of the roll body.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1)
[0018] The manufacturing method of the high-hardness large-scale forged steel backup roll of the present embodiment is as follows:
[0019] ① According to the following chemical composition and weight percentage, adopt conventional methods to smelt and forge the roll blank: carbon 0.51%, silicon 0.82%, manganese 0.90%, chromium 5.19%, nickel 0.14%, molybdenum 0.50%, vanadium 0.20%, phosphorus 0.008%, Sulfur ≤ 0.003%, the rest is iron and unavoidable impurities.
[0020] ②Preliminary heat treatment at a temperature of 980°C.
[0021] ③ Semi-finishing: Grinding the surface of the roller body to a roughness Ra of 0.5 μm, and processing the chamfering of the roller body to R80, and polishing the chamfer within 50-100 mm.
[0022] ④ final heat treatment, as follows:
[0023] S1: Before the overall induction heating, paste refractory cotton on the end face of the roll body and the joint of the roll neck of the roll body, and then preheat the large forged steel backup roll at a tem...
Embodiment 2~ Embodiment 5)
[0031] The manufacturing method of the high-hardness large-scale forged steel backup roll of each embodiment is basically the same as that of embodiment 1, and the difference is shown in Table 1.
[0032] Table 1
[0033] Example 1 Example 2 Example 3 Example 4 Example 5 C 0.51% 0.51% 0.51% 0.45% 0.55% Si 0.82% 0.82% 0.82% 1.00% 0.75% mn 0.90% 0.90% 0.90% 1.00% 0.80% Cr 5.19% 5.19% 5.19% 4.80% 5.50% Ni 0.14% 0.14% 0.14% 0.10% 0.30% Mo 0.50% 0.50% 0.50% 0.40% 0.70% V 0.20% 0.20% 0.20% 0.10% 0.30% P 0.008% 0.008% 0.008% 0.008% 0.008% S 0.003% 0.003% 0.003% 0.003% 0.003% The first stage 1800kW / 30min 2000kW / 25min 1700kW / 35min 1800kW / 30min 1800kW / 30min second stage 1000kW / 30min 1200kW / 25min 800kW / 35min 1000kW / 30min 1000kW / 30min The third stage 400kW / 40min 500kW / 30min 300kW / 50min 400kW / 40min 400kW / 40min
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com