The invention relates to a small-section mining roadway mixing type advanced support method and belongs to the technical field of mining roadway supports. The method solves the problems that an existing support method is low in support efficiency, large in labor intensity of workers, high in cost, low in mining efficiency, insufficient in effective construction space and low in operation safety and reliability. The support method comprises the steps that 1, a mining roadway to be supported is determined; 2, a grouting anchor cable and an individual hydraulic prop mixing type advanced support are additionally installed on a top plate of the mining roadway, and a top plate support structure is formed; and 3, in the coal mining process, while the mining working face is propelled forwards, thegrouting anchor cable is additionally installed in the propelling direction constantly, an individual hydraulic prop and a hinge top beam of the working face end are pushed towards the front end of the advanced support constantly, and thus the distance of the advanced support is kept within the safe range. According to the method, the support efficiency and the mining efficiency are improved, thelabor intensity of the workers and the support cost are reduced, the support strength is higher, the support effect is better, and safe and efficiency production is achieved.