A Repairing Method for Reinforced Concrete of Damaged Bridge Pier
A technology of reinforced concrete and bridge piers, which is applied in the field of bridges, can solve the problems of repair materials spalling and repair failure, and achieve the effects of reducing cracks and cracks, prolonging service life and delaying the electrochemical reaction process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0030] A method for repairing reinforced concrete of damaged bridge piers,
[0031] First, clean the surface of the damaged bridge pier until there is no debris or water on the surface.
[0032] Coat the exposed steel bar surface with a steel bar rust inhibitor, the steel bar rust inhibitor is composed of: sodium tetraborate 12g / L, sodium silicate 9g / L, tetradecyl dimethyl benzyl ammonium chloride 5g / L, tetrahydrofuran 4g / L, chromium nitrate 3g / L, threonine 1g / L, and the balance is water, bake the coated rust-proof layer, the baking temperature is controlled at 60-70°C, and the baking time is 10 minutes.
[0033] Then the interface binder is sprayed to damage the concrete surface, and it is sprayed evenly and left to stand for 5 minutes.
[0034] The antifreeze repair material is used to repair and fill the bridge pier defect, and after filling and repairing, it is naturally cured for 12 hours.
[0035] The preparation method of the antifreeze repair material includes the fo...
Embodiment 2
[0039] A method for repairing reinforced concrete of damaged bridge piers,
[0040] First, clean the surface of the damaged bridge pier until there is no debris or water on the surface.
[0041] Coat the exposed steel bar surface with steel bar rust inhibitor, the steel bar rust inhibitor is composed of: sodium tetraborate 11g / L, sodium silicate 8g / L, tetradecyl dimethyl benzyl ammonium chloride 3g / L, tetrahydrofuran 3g / L, chromium nitrate 3g / L, threonine 2g / L, and the balance is water. Baking the coated rust-proof layer, the baking temperature is controlled at 60-70°C, and the baking time is 12 minutes.
[0042]Then the interface binder is sprayed to damage the concrete surface, and it is sprayed evenly and left to stand for 6 minutes.
[0043] The anti-freeze repair material is used to repair and fill the bridge pier defect, and after filling and repairing, it is naturally cured for 16 hours.
[0044] The preparation method of the antifreeze repair material includes the fo...
Embodiment 3
[0048] A method for repairing reinforced concrete of damaged bridge piers,
[0049] First, clean the surface of the damaged bridge pier until there is no debris or water on the surface.
[0050] Coat the exposed steel bar surface with steel bar rust inhibitor, the steel bar rust inhibitor is composed of: sodium tetraborate 10g / L, sodium silicate 10g / L, tetradecyl dimethyl benzyl ammonium chloride 5g / L, tetrahydrofuran 3g / L, chromium nitrate 3g / L, threonine 3g / L, and the balance is water. Baking the coated antirust layer, the baking temperature is controlled at 60-70°C, and the baking time is 15 minutes.
[0051] Then the interface binder is sprayed to damage the concrete surface, and it is sprayed evenly and left to stand for 7 minutes.
[0052] The antifreeze repair material is used to repair and fill the bridge pier defect, and after filling and repairing, it is naturally cured for 18 hours.
[0053] The preparation method of the antifreeze repair material includes the fol...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com