Production method of easily formable high-strength medium-thick steel plate
A production method and thick steel plate technology, which is applied in the field of steelmaking, can solve problems such as difficulty in meeting actual use requirements, low uniform elongation of steel plates, and uncontrolled yield strength ratio, so as to improve the ability to resist dynamic loads, improve welding performance, The effect of reducing the yield ratio
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Embodiment 1: 20mmQ800F steel plate production method
[0027] The chemical composition of the steel is shown in Table 3.
[0028] Table 3 Composition performance of 20mm Q800F steel plate (%)
[0029] chemical composition C Si mn P S Nb+V+Ti Cr + Mo Alt Pcm CEV Performance 0.07 0.21 1.68 0.014 0.002 0.067 0.45 0.032 0.22 0.52
[0030] Main process steps:
[0031] a. Sulfur content of molten iron S≤0.020%, temperature ≥1250°C, the slag must be cleaned before the molten iron enters the converter. Converter end point control target: C-T coordinated tapping, P 0.012%, S 0.015%; strict slag blocking and tapping, slag thickness ≤ 50mm, tapping time 7min, 1 / 5 of tapping is added with alloy, 2 / 5 of tapping is finished with alloy ; After the steel is tapped into the Al line 290m deoxidation.
[0032] b. The electrification time of the molten steel in the LF furnace is 22 minutes, the total argon blowing time is 42 minutes, and t...
Embodiment 2
[0038] Embodiment 2: 30mmQ800F steel plate production method
[0039] The chemical composition of the steel is shown in Table 4.
[0040] Table 4 Composition performance of 30mm Q800F steel plate (%)
[0041] chemical composition C Si mn P S Nb+V+Ti Cr + Mo Alt Pcm CEV Performance 0.08 0.23 1.67 0.013 0.003 0.110 0.93 0.034 0.23 0.59
[0042] Main process steps:
[0043] a. Sulfur content of molten iron S≤0.020%, temperature ≥1250°C, the slag must be cleaned before the molten iron enters the converter. Converter end point control target: C-T coordinated tapping, P 0.013%, S 0.016%; strict slag blocking, slag thickness ≤ 50mm, tapping time 6min, 1 / 5 of tapping is added with alloy, 2 / 5 of tapping is finished with alloy ; After the steel is tapped into the Al wire 300m deoxidation.
[0044] b. The electrification time of the molten steel in the LF furnace is 22 minutes, the total argon blowing time is 44 minutes, and the white sla...
PUM
Property | Measurement | Unit |
---|---|---|
thickness | aaaaa | aaaaa |
thickness | aaaaa | aaaaa |
thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com