46 results about "Work package" patented technology

In project management, a work package is a subset of a project that can be assigned to a specific part for execution. Because of the similarity, work packages are often misidentified as projects. Work packages are defined by brief statements of Activity Description, Activity Resources of Skill and Expertise, Activity Estimates of Effort and Duration, Activity Schedule, Activity Risks, and Activity Budget. Work Packages are assigned a Work Authorization or Control Account. Estimates of work packages are used in Earned Value Management to calculate the Planned Value. Progress made in the work package is used to calculate the Earned Value. Actual costs charged to the work package are used in variance analysis.

Project management progress arranging method and project management progress arranging system

InactiveCN103295100AAchieve optimal configurationIncrease the speed of orchestrationResourcesProgram planningTime limit
The invention provides a project management progress arranging method and a project management progress arranging system which aim at re-optimizing a progress plan to enable resource allocation of a project to be optimal at any time. The project management progress arranging method includes the following steps: (1), generating a project quantity list, namely decomposing a building information model into work packages, reading material information in the work packages and creating the project quantity list according to defined project quantity calculating rules; (2), generating a progress plan, namely calculating labor time and forming the progress plan on the basis of the project quantity list and according to constraint conditions like a logical relationship between labor quotas and processes and total resources; (3), optimizing the progress plan, namely optimizing the progress plan within a reasonable time limit and based on a PSO (particle swarm optimization) algorithm to obtain an optimal progress schedule meeting requirements of optimization of resource allocation.
Owner:SIPPR ENG GROUP

Object-oriented framework for document routing service in a content management system

An object-oriented framework for document routing service in a content management system directly provides the server API set for document routing to the application programmers, without an intermediate interface layer. This framework provides document routing functions and system administration support for document routing. In addition, the system defines the document routing process as a series of steps provided by an administrator through which a document is routed, where a work node is a step within the process. A work list is provided that is a filter of one or more work nodes; a user may obtain a list of work or the “next” work item from the work list. Work packages can be suspended pending the satisfaction of criteria such as delay time or collection of a specified group of documents. The process can be resumed at any time. Suspension and resumption of the process are defined by the resume list in the work package and the work node. The object-oriented framework defines the object model of the document routing service that includes a set of classes and associated methods to support the model.
Owner:TWITTER INC

Electronic template and correlation method thereof on basis of wind power generation enterprise tour-inspection, two tickets and work packages

The invention relates to an electronic template and a correlation method thereof on the basis of wind power generation enterprise tour-inspection, two tickets and work packages.The electronic template based on the wind power generation enterprise tour-inspection, two tickets and work packages comprises an equipment tour-inspection module, a maintenance application form module, a work ticket module, an operation ticket module and a work package module.By means of the electronic template correlation method based on the wind power generation enterprise tour-inspection, two tickets and work packages, correlations among application systems such as an ERP, OA, an SIS, an MIS, two ticket management, defect management and a tour-inspection system are achieved initiatively, the full process correlation of production management is achieved, department barriers in the management process at present are gotten through, data interconnection and information sharing in all service application systems are achieved, the situation that the working time and work content information of the overall process from equipment problem finding to problem solving are viewed through selection of maintenance tasks is achieved for the first time, and powerful data support is provided for optimizing the production management process.
Owner:SHANDONG CHUANGDE SOFTWARE TECH

Systems And Methods Of Integrated And Automated Generation Of Work Packages

InactiveUS20110178935A1ResourcesWork packageTraceability
Systems and methods of dynamic work package generation are presented that allow not only real-time modification of construction work packages, but also allow tracking of the work packages throughout completion and generation / updating of constructions records. The systems and methods contemplated herein will therefore improve management of safety and non-safety components, allow for traceability and tracking, and reduce errors due to user intervention.
Owner:FLUOR TECH CORP

Building information model component and work decomposition structure association method and system

The invention relates to a building information model component and work decomposition structure association method and system. The method comprises the following steps: taking a minimum WBS work package of a work decomposition structure of the engineering project as a unit; in the WBS work package, a building information model BIM component is used as a core; associating the progress of the engineering project; The method has the advantages that the method is simple, the quality, the cost, the safety, the data and the contract information are improved, multiple modes such as automatic or manual association of the WBS work package and the BIM component, click selection, frame selection, conditional selection and user-defined coding are provided, the association relationship between the work package and the BIM component is established, the method is universal in applicability and high in efficiency, and the practical level can be achieved.
Owner:SHANGHAI BLUE EARTH TECH CO LTD

Intelligent nuclear power station business process building method and uniform business process handling platform

The invention discloses an intelligent nuclear power station business process building method and a uniform business process handling platform. The intelligent nuclear power station business process building method includes the steps of building a nuclear power business activity WBS (work breakdown structure) system which comprises nuclear power business activity work elements; acquiring nuclear power business activity work packages which are the most-derived units of the nuclear power business activity WBS system; acquiring inputs and outputs of the nuclear power business activity work packages; correlating the input of any nuclear power business activity work package with the output of the other optional nuclear power business activity work package; and forming a process based business logic network according to a correlation result so as to form the nuclear power business handing process. Therefore, the technical problems that automatic transmission of cross-specialty and cross-plate information is difficult to realize at specific work nodes and specific business execution details is difficult to monitor are solved, domination and electronization of logical relations among vast business elements of the nuclear power stations are achieved, and execution efficiency of nuclear power business is improved obviously.
Owner:中广核工程有限公司 +1

Whole process project management platform

The embodiment of the invention provides a whole process project management platform, and the platform comprises an information configuration module which is used for configuring the identification information of each company participating in construction and the operation authority corresponding to each company participating in construction; a plan management module which is used for editing themain plan and the personal expansion plan and pushing the personal work task at the time point corresponding to the plan; a node setting module used for setting names and planned time ranges of milestone nodes; a progress display module used for displaying the comparison between the actual progress and the planned progress; a task management module used for editing personal work tasks and creatingnew personal work tasks; and a work package editing module used for editing a preset work item template. By means of the project management platform, projects can be supervised from the whole processand multiple stages, project plans can be conveniently planned by all construction participation units, and the overall progress conditions of the projects can be mastered; work templates can be generated according to national standards, and various report forms commonly used in project management can be automatically generated.
Owner:广东天衡工程建设咨询管理有限公司

BIM rapid changing method

InactiveCN111651818ARealize semi-automatic processingGeometric CADConstraint-based CADProcess engineeringWork package
The invention provides a BIM (Building Information Modeling) rapid changing method, which comprises the following steps of decomposing a BIM into a work package, reading model primitive entity information in the work package, and obtaining a material and a geometric attribute; generating an engineering quantity list according to an engineering quantity calculation rule, wherein the engineering quantity calculation rule comprises definitions of a statistical unit, a statistical algorithm and a data category; and on the basis of the bill of quantities, calculating the labor time according to thedefined labor quota, the logical constraint relationship between the processes and the constraint condition of the total resources, and establishing a progress plan. According to the method, the change content is embodied on the model, and meanwhile, the change of the engineering quantity, the cost, the progress and the like generated by change can be directly obtained.
Owner:STATE GRID JIANGSU ELECTRIC POWER CO LTD NANTONG POWER SUPPLY BRANCH

Engineering witness management method, system, device and medium

The invention belongs to the technical field of engineering construction management, and particularly relates to an engineering witness management method, system, device and medium; the method comprises the following steps: creating a witness project and a project witness work package system; obtaining an engineering witness picture and a witness mark corresponding to the witness work package, andgenerating a witness project bill; obtaining an inspection evaluation from an inspection person; obtaining an audit evaluation of from an auditor; generating internal management information, shared information, remote online monitoring information and a rectification item witness work package according to the obtained information; and accurately managing the identified non-conforming situation byusing statistical data and image information. The engineering witness management method, the system, the device and the medium forms an information management method integrating the witness management, the participation of the participating parties and the remote technical support and online monitoring of the witness enterprise through information collection, information evaluation, information statistics and information management, and builds a safe project for engineering construction by using engineering construction information management.
Owner:杭州溯影信息技术有限公司

Object-oriented ship body segment workshop plan scheduling and publishing method and system

The invention discloses an object-oriented ship body segment workshop plan scheduling publishing method and system. The method comprises the following steps: carrying out layer-by-layer intermediate product composition decomposition on each ship block DAP, wherein an intermediate product at the bottommost layer is a part, each intermediate product of the ship body segment is used as a work package, and the same intermediate products of the same level of the ship body segment are integrated into a work package group; calculating working hours of each intermediate product and each ship body segment based on the working hours of each part; inputting final demand time of each segment, setting rated production capacity of equipment and teams thereof, and performing load balance adjustment on planned production time of each working packet in the same working packet group according to a load optimization balance logic principle for the first layer by taking the rated production capacity as anupper limit; and after the adjustment of the first level is finished, carrying out load balance adjustment on the same working packet group of the next level according to a load optimization balancelogic principle for each next level until the balance is finished or the production capacity cannot be adjusted, and outputting an optimal working packet group plan.
Owner:上海申博信息系统工程有限公司 +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products