BIM rapid changing method
A model and fast technology, applied in the field of rapid change of BIM model, can solve the problems that cannot reflect the cost and progress of plan change, and achieve the effect of semi-automatic processing
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The specific implementation of a method for quickly changing a BIM model of the present invention will be described in detail below in conjunction with the accompanying drawings.
[0027] A method for quickly changing a BIM model of the present invention specifically comprises the following steps: step (1), decomposing the BIM model into work packages, reading the model graphic element entity information in the work package, and obtaining material and geometric attributes; step (2) 1. Generate the bill of quantities according to the engineering quantity calculation rules; wherein, the engineering quantity calculation rules include the definition of statistical units, statistical algorithms, and data categories; step (3), based on the engineering quantity bill, according to the defined labor quota , the logical constraint relationship between processes, and the constraints of total resources to calculate the labor time and establish a schedule.
[0028] Such as figure 1...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com