Problems solved by technology

[0007] However, conventional methods are all based on a single project. In fact, a general-scale enterprise organization often has hundreds of projects going on at the same time, and hundreds or even thousands of people participate in these projects. These project members come from across departments. , cross-level, cross-professional, cross-border and cross-border and external personnel, forming very complex resource planning, resource load and efficient manpower arrangement
It is known that the project-based resource compensation and other models can no longer solve this problem, and the existing project management software has not proposed a better solution

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project management system
  • Project management system
  • Project management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0044] In this embodiment, a project refers to a temporary effort to create a unique product or service, and each project can be broken down into multiple levels of WBS. That is to say, dismantling the project scope layer by layer, and dismantling it into smaller units at the bottom, so as to facilitate the estimation of human resources, cost and construction period, is widely called "Create work breakdown structure". structure, referred to as generating WBS), the unit that must be completed at the lowest level is called a work package. The work breakdown structure is a multi-layered structure, also known as project scope or product scope. The number of levels depends on the nature, size and complexity of the project. Planning the tasks that need to be executed to complete these work packages is called Activities define. Each work package can be disassembled into at least one activity (usually expanded into multiple activities). Through the activity definition, we can get For...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A project management system is provided. The project management system includes an information access module, a performance management module, a performance index determination module, and a performance result output module. The project management system is configured to manage at least one project and is adapted for integrating a plurality of projects, so as to control and manage the project management performance of a department or inter-department and multiple levels. The project management system can use non-monetary units, such as working hours, number of work package, or number of activity, to evaluate performance.

Description

technical field [0001] The present invention relates to a project management system, in particular to a project management system including performance measurement based on work package quantity, activity quantity and working hours. Background technique [0002] In recent years, the development of new products, the expansion of new markets and the acquisition of new customers in the business world, as well as the internal organizational changes, process transformation and establishment of information systems, etc., such non-routine affairs, whether strategic Or management planning and execution are usually carried out in the form of projects. The purpose is to use the process and methods of project management to achieve the planned goals of the project on schedule under limited resource cost investment and risk control. Therefore, in the increasingly tense global competitive environment, project management plays a pivotal role in business operations. [0003] When measuring...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/00
CPCG06Q10/06315
Inventor 魏赐聪
Owner 魏赐聪
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products