[0036] Preparation of 0.1mm thick TA15 titanium alloy foil
[0037] Step 1, smelting the TA15 titanium alloy ingot whose target composition is Ti-6.5Al-1.4Mo-1.4V-2.0Zr-0.05O, keeping the titanium alloy ingot in a heating furnace at a temperature of 1100°C for 200 minutes, and placing it on a forging machine Carry out slab forging, the final forging temperature is not lower than 980°C, and obtain a slab for rolling, the size of the obtained slab is 120mm×465mm×515mm, and the total deformation in the thickness direction of the slab is not less than 80%;
[0038] Step 2, heat the obtained slab in a heating furnace at a temperature of 960° C. for 100 minutes, and carry out billet rolling on a rolling mill to obtain a billet with a thickness of 10 mm, the number of rolling passes is one time, and the deformation is 92%;
[0039] Step 3: After cutting the obtained billet, keep it in a heating furnace with a temperature of 30°C above the β transformation point for 60 minutes, and wa...
Embodiment 2
[0050] Preparation of TA15 titanium alloy foil with a thickness of 0.2mm
[0051] Step 1, melting the TA15 titanium alloy ingot whose target composition is Ti-6.5Al-1.2Mo-1.2V-2.0Zr-0.1O, keeping the titanium alloy ingot in a heating furnace at a temperature of 1050°C for 240min, and placing it on a forging machine Carry out slab forging, the final forging temperature is not lower than 980°C, and obtain a slab for rolling, the size of the obtained slab is 115mm×465mm×515mm, and the total deformation in the thickness direction of the slab is not less than 80%;
[0052] Step 2, heat the obtained slab in a heating furnace at a temperature of 900° C. for 150 minutes, and carry out billet rolling on a rolling mill to obtain a billet with a thickness of 12 mm. The number of rolling passes is one time, and the amount of deformation is 90%;
[0053] Step 3: After cutting the obtained billet, keep it in a heating furnace with a temperature of 50°C above the β transformation point for 9...
Embodiment 3
[0064] Preparation of TA15 titanium alloy foil with a thickness of 0.15mm
[0065] Step 1, melting the TA15 titanium alloy ingot whose target composition is Ti-6.5Al-1.6Mo-2.2V-2.1Zr-0.06O, keeping the titanium alloy ingot in a heating furnace at a temperature of 1050°C for 220min, and placing it on a forging machine Carry out slab forging, the final forging temperature is not lower than 980°C, and obtain a slab for rolling, the size of the obtained slab is 125mm×465mm×515mm, and the total deformation in the thickness direction of the slab is not less than 80%;
[0066] Step 2, heat the obtained slab in a heating furnace at a temperature of 920° C. for 120 minutes, and carry out billet rolling on a rolling mill to obtain a billet with a thickness of 8 mm. The number of rolling passes is one time, and the amount of deformation is 93%;
[0067] Step 3: After cutting the obtained billet, keep it in a heating furnace with a temperature of 40°C above the β transformation point for ...
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Average grain size | aaaaa | aaaaa |
Tensile strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com