Integrated prefabrication method for connecting concrete shear wall and filler wall

A concrete shear wall and connection method technology, which is applied in the field of construction, can solve problems such as inability to resist cracking, damage to the quality of the house, troubles for users, etc., and achieve the effects of saving material consumption, excellent quality of finished products, and improving work efficiency

Active Publication Date: 2015-08-12
凡林装配式建筑科技有限公司
View PDF10 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The common problems of the connection methods shown in the above diagrams are: the connection is only a simple pasting connection or a high-ductility and low-strength fiber material pasting connection, and no tensile steel wire or steel bar is used to connect the two as a whole, which cannot resist the building. The cracking phenomenon between the prefabricated non-load-bearing wall and the structural components due to dry shrinkage and cold shrinkage causes the connection to fail, affects the visual effect of the wall, damages the quality of the house, and brings unnecessary troubles to users
According to Article 13.2.1, Paragraph 2 of the "Code for Seismic Design of Buildings" (GB50011-2010), it is stipulated that "the rigidity of non-structural components embedded in the plane of lateral force-resistant components shall be included in the rigidity effect", which is actually It is a very difficult job in engineering design, because there is no calculation method how to take its stiffness into account

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Integrated prefabrication method for connecting concrete shear wall and filler wall
  • Integrated prefabrication method for connecting concrete shear wall and filler wall

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0028] The integrated prefabricated connection method of the concrete shear wall and the filling wall comprises the following steps:

[0029] Step 1. Formwork is performed on the prefabricated concrete shear wall 1 and the prefabricated infill wall 2 according to the construction design requirements.

[0030] Step 2: After the form work is completed, enter the program of binding steel bars.

[0031] Bind the steel bars of the prefabricated concrete shear wall 1 and the steel wires 4 of the prefabricated filling wall, and extend the steel wires 4 of the prefabricated filling wall 50mm into the interior of the prefabricated concrete shear wall 1 .

[0032] Step 3, if the prefabricated concrete shear wall 1 or the prefabricated infill wall 2 is a hollow structure, insert the mold corresponding to it;

[0033] If the prefabricated concrete shear wall 1 or the prefabricated infill wall 2 is a solid structure, go directly to step 4.

[0034] Step 4: Place and fix the soft material...

Embodiment 2

[0039] The integrated prefabricated connection method of the concrete shear wall and the filling wall comprises the following steps:

[0040] Step 1. Formwork is performed on the prefabricated concrete shear wall 1 and the prefabricated infill wall 2 according to the construction design requirements.

[0041] Step 2: After the form work is completed, enter the program of binding steel bars.

[0042] The steel bars of the prefabricated concrete shear wall 1 and the steel wires 4 of the prefabricated filling wall are bound, and the steel wires 4 of the prefabricated filling wall are extended into the interior of the prefabricated concrete shear wall 1 by 100 mm.

[0043] Step 3, if the prefabricated concrete shear wall 1 or the prefabricated infill wall 2 is a hollow structure, insert the mold corresponding to it;

[0044] If the prefabricated concrete shear wall 1 or the prefabricated infill wall 2 is a solid structure, go directly to step 4.

[0045] Step 4: Place and fix th...

Embodiment 3

[0050] The integrated prefabricated connection method of the concrete shear wall and the filling wall comprises the following steps:

[0051] Step 1. Formwork is performed on the prefabricated concrete shear wall 1 and the prefabricated infill wall 2 according to the construction design requirements.

[0052] Step 2: After the form work is completed, enter the program of binding steel bars.

[0053] Bind the steel bars of the prefabricated concrete shear wall 1 and the steel wires 4 of the prefabricated filling wall, and extend the steel wires 4 of the prefabricated filling wall 200mm into the interior of the prefabricated concrete shear wall 1 .

[0054] Step 3, if the prefabricated concrete shear wall 1 or the prefabricated infill wall 2 is a hollow structure, insert the mold corresponding to it;

[0055] If the prefabricated concrete shear wall 1 or the prefabricated infill wall 2 is a solid structure, go directly to step 4.

[0056] Step 4: Place and fix the soft material ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an integrated prefabrication method for connecting a concrete shear wall and a filler wall, and belongs to the technical field of buildings. The integrated prefabrication method comprises a prefabricated concrete shear wall, a prefabricated filler wall, a soft material and prefabricated filler wall steel wires. The integrated prefabrication method is realized through the following steps: carrying out form erecting according to design requirements; binding reinforcing steel bars and steel wires of a wall body; putting corresponding molds into the prefabricated concrete shear wall and the prefabricated filler wall if the prefabricated concrete shear wall and the prefabricated filler wall are hollow; putting the soft material between the prefabricated concrete shear wall and the prefabricated filler wall; pouring wall body concrete for demolding after maintenance. The method can ignore the influence of the filler wall on the lateral-displacement-resistant rigidity of the overall structure, the structure stress is accurate, the force transmission lines are clear, and the reliability of the structure is guaranteed; moreover, the integrated prefabrication method is simple, the production and construction mounting of prefabricated parts are facilitated, the quality and efficiency are improved, the construction cost is reduced, and the method has positive meanings for the development of prefabricated concrete construction.

Description

technical field [0001] The invention belongs to the technical field of construction, and in particular relates to an assembled concrete structure. Background technique [0002] There are three main types of filling walls for prefabricated concrete shear wall structures: [0003] The first category is post-masonry methods, see Code for Design of Masonry Structures (GB50003-2011). Belonging to the traditional construction method, the consumption of materials and manpower is high, the cost is high, the quality is poor, and the work efficiency is low. [0004] The second category is site-installed prefabricated wall panel infill walls. See "Steel Grid Cement Polystyrene Sandwich Wall" (Atlas No.: 05J3-5) jointly compiled by Hebei, Tianjin, Shanxi, Inner Mongolia, and Henan, and published by China Building Industry Press; Jiangsu Provincial Architectural Standard Design Atlas " Lightweight Wall Panel Structure Atlas" (Atlas No.: Su JT15-2005); Guangdong Provincial Building Sta...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E04B2/00E04B2/84
Inventor 孟凡林孟祥瑞付萍孟锦
Owner 凡林装配式建筑科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products