[0003] The above installation methods have the following disadvantages: the originally weak frame is deformed after several times of handling or the wrapping paper is partially damaged. Most of the existing high-rise walls are made of soft lightweight bricks, which are fixed with steel nails due to bumps and fillings. The expansion force of the
mortar will loosen and cause the frame to deform and move. The reason is that when the smooth steel nails with the same
diameter at the head and
tail are pressed in by the hammer, they will squeeze and loosen the light bricks to expand and loosen the steel nails. , Ding Ding, and steel nails nailed to the head cannot meet the frame adjustment requirements with a unit of 1mm, and the deviation is inevitable. In addition, the anchor iron sheet and long wooden wedge will interfere with the filling of the mortar, and the unsaturated
cement mortar will reduce the strength of the frame. Compatible with waterproof performance, saturation will bulge and squeeze the frame deformation to increase the error; in order to use the
laser ink line meter to refer to the indoor ground horizontal ink line to correct the frame by using the external wall ink line, there will be horizontal errors in the
window level between rows plus the horizontal error of the masonry on the external wall tiles rate, causing the push-pull drainage holes to be blocked, and the outer side-opening fan frame to be unable to be installed. To save labor, the error of correcting the frame with a level ruler is larger; the outer wall materials and workers must enter and exit from the frame, which is inevitable. It will damage the frame and wrapping paper, and some of them must be replaced if they are damaged by
falling objects from the upper layer. When the film is applied to the labor-saving frame packaging, there is no edge left on the inner and outer back, which will cause a temporary interlayer.
Corrosion will cause the waterproof glue to crack and be cleaned
Alkaline water on the wall will leak through the joints of the wrapping paper or directly invade the surface of the corroded frame from the damaged part. The damage to the sand surface, flat surface and
polishing material is more serious, and sometimes the whole part needs to be replaced. If the construction period exceeds six months, it will also appear. The wrapping paper is fixed on the frame and it is difficult to tear and clean; the door and window frame and leaf are an active combination of a square and a square, or a square and several squares, and the concentric flatness of positive angles is very high. , and the above reasons, as well as the constraints of high-altitude operations, multiple types of construction on construction sites, safety, and deadlines, there are still large errors in the careful installation of the frame, and the large error will increase the difficulty of installing tempered fixed glass and reduce the fall-off prevention of
doors and windows. , waterproof, leak-proof, energy-saving, sliding opening and closing performance, if the error is too large, it is necessary to change the size of the fixed glass or fan frame to install it
Although the
steel square tube sub-frame solves the original shortcomings, it has a new
disadvantage: it must be made of galvanized square tubes with a wall thickness of more than 2mm and a thickness of more than 25mm so that it will not be weak and heavy, and it will be troublesome to transport and install;
Arc welding will cause deflection and warping deformation, so it is very labor-intensive to make a sub-frame with a positive angle and flatness. If a
single area exceeds 3m2, it must be removed after
welding and temporary support, otherwise it will droop and arch. It is difficult to deform It is very expensive to install and must be painted with anti-
rust paint. The door and window frames are fixed on the sub-frame with screws. Leakage of water will cause the square
pipe to
rust and swell off the outer wall tiles and waterproof glue joints. The closed square
pipe cavity has a speaker effect, and the sliding door frame used for sliding
doors and windows has a large echo. The biggest
disadvantage is the thickness of the sub-frame
Cement mortar is required to cover both sides to the inner plane, which will increase the difficulty and
workload of the mason to make the inner and outer window sills. For example, when there is a gap of 20-25mm between the sub-frame and the door and
window opening, the inner and outer window sills should be filled with 45-50mm of mortar. Especially the suspension mortar above the sub-frame and the
lintel must be divided into 2-3 times with an interval of 24 hours each time to make the door and
window sill. If the edge error of the door and window hole is just above the sub-frame, it is difficult to make a suspension
window sill of more than 50mm Larger, this will increase the cost of the sub-frame, and if the suspension is too thick, there will be a danger of
cracking and falling off over time. Another main
disadvantage is that the sub-frame will transfer heat and is not suitable for use in insulating doors and windows. The above shortcomings cause steel squares It is difficult to popularize and apply tube sub-frame and
branch technique