Set of management and maintenance system for monitoring clusters of urban major transportation infrastructures
A technology of infrastructure and monitoring system, applied in the direction of transmission system, data exchange through path configuration, special data processing application, etc. Problems such as communication and integration, to achieve the effect of prolonging mean time between failures, easy upgrade and modification, and flexible expansion
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] refer to Figure 1~Figure 4 , a cluster monitoring and complete set of management and maintenance system for major urban traffic infrastructure, the system includes:
[0042] Online monitoring module: the core is the database management module, which is used to manage all data such as bridge construction information, geometric information, monitoring information and analysis results. It is the core of the cluster monitoring system and is responsible for data storage, backup, modification, deletion and query Function;
[0043] Data analysis and processing module: compare and statistically analyze the preprocessed monitoring data through the sensor module, list or graphically display the structural state changes under various loads and environmental factors, and form a bridge health file;
[0044] Early warning evaluation module: it is used to evaluate the operating status of the structure and analyze the safety, applicability and durability of the structure based on the d...
Embodiment 2
[0081] The following will further illustrate the present invention through the specific steps of the embodiments and in conjunction with the accompanying drawings.
[0082] Referring to Figure 5(a) to Figure 11(c), taking Yeqingdou Bridge, a tied arch bridge located on Wenhui Road in Hangzhou City as an example, the overall layout of the bridge is shown in Figure 5(a). The upper structure of the bridge adopts the under-supported reinforced concrete tie arch, the calculated span is 71.6 m, the rise height is 14.32 m, and the rise-span ratio is 1:5; the arch axis is in the form of a quadratic parabola, and the equation is y=4×14.32 / 71.6 2 ×(71.6-x)x; there are 17 pairs of suspenders in the whole bridge, and the distance between adjacent suspenders is 4 m; the lower part is a reinforced concrete box abutment, and the 120 cm bored pile foundation. The total width of the bridge deck is 27.7 m, and the horizontal layout is: 3.25 m (sidewalk) + 1.60 m (tie beam) + 18.00 m (motor vehi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com