Boron-containing die steel and heat treatment method thereof
A heat treatment method and die steel technology, applied in heat treatment equipment, manufacturing tools, quenching agents, etc., can solve the problems of excessive carbides and high brittleness of die steel, and achieve good fatigue resistance and spalling performance, high production efficiency, The effect of low energy consumption
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0026] The heat treatment process of boron-containing die steel of the present invention is as follows:
[0027]1) Put the boron-containing mold steel into the heating furnace, raise the temperature to 920°C and keep it for 4 hours; then cool the furnace to 500°C and take it out of the furnace for air cooling;
[0028] 2) Heat the mold steel treated in step 1) to 1080°C in a heating furnace and keep it warm for 2 hours; then cool the furnace to 950°C and keep it warm for 3 hours; then cool it in quenching oil at a temperature of 30-60°C , wherein the mass ratio of quenching oil to die steel is 15:1;
[0029] 3) Heat the mold steel treated in step 2) to 250°C in a heating furnace and keep it warm for 8 hours; then cool it to 150°C and air-cool it out of the furnace, and finally finish machining to the specified size and precision.
Embodiment 2
[0031] 1) Put the boron-containing mold steel into the heating furnace, heat it up to 880°C and keep it warm for 8 hours; then cool the furnace to 500°C and take it out of the furnace for air cooling;
[0032] 2) Heat the mold steel treated in step 1) to 1050°C in a heating furnace and keep it warm for 4 hours; then cool the furnace to 980°C and keep it warm for 1 hour; then, heat it in quenching oil at a temperature of 30-60°C Cooling, wherein the mass ratio of quenching oil to die steel is 15:1;
[0033] 3) Heat the mold steel treated in step 2) to 220°C in a heating furnace and keep it warm for 15 hours; then cool it to 150°C and air-cool it, and finally finish machining to the specified size and precision.
Embodiment 3
[0035] 1) Put the boron-containing mold steel into the heating furnace, heat it up to 900°C and keep it warm for 6 hours; then cool the furnace to 500°C and take it out of the furnace for air cooling;
[0036] 2) Heat the mold steel treated in step 1) to 1060°C in a heating furnace and keep it warm for 3 hours; then cool the furnace to 960°C and keep it warm for 2 hours; then, heat it in quenching oil at a temperature of 30-60°C Cooling, wherein the mass ratio of quenching oil to die steel is 15:1;
[0037] 3) Heat the mold steel treated in step 2) to 240°C in a heating furnace and keep it warm for 10 hours; then cool it to 150°C and air-cool it, and finally finish machining to the specified size and precision.
PUM
Property | Measurement | Unit |
---|---|---|
diameter | aaaaa | aaaaa |
tensile strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com