Production technology for melting steel by electric arc furnace converter
A production process and electric furnace technology, applied in the direction of electric furnace, process efficiency improvement, furnace, etc., can solve the problems of large scrap steel consumption, large power consumption, large electrode consumption, etc., and achieve low power consumption and small electrode consumption , the effect of reducing residual elements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0017] Embodiment 1: Utilize the production technology provided by the present invention to carry out the smelting of 20# tube billet steel.
[0018] The electric arc furnace is a 100-ton ultra-high-power electric arc furnace. The proportion of molten iron in the furnace charge structure is 60%. The charging order of the furnace charge is primary scrap steel, primary molten iron, secondary molten iron, and secondary scrap steel. Add about 30 tons of light and thin material to the primary steel scrap, add about 10 tons of light and thin material to the secondary material, and add about 10 tons of crushed material. 3 , to increase the specific gravity of the pile and avoid pressing. Refractory steel scrap with large size such as tundish injection, briquetting and shearing materials cannot be used.
[0019] Oxygen supply system: Oxygen supply after the addition of molten iron, mainly furnace wall guns, control the total oxygen supply ≤ 600m 3 ; After the secondary molten iron i...
Embodiment 2
[0024] Embodiment 2: Utilize the present invention to smelt 45# steel.
[0025] The electric arc furnace is a 100-ton ultra-high-power electric arc furnace. The proportion of molten iron in the furnace charge structure is 65%. The charging order of the furnace charge is primary scrap steel, primary molten iron, secondary molten iron, and secondary scrap steel. Add about 25 tons of light and thin material to the primary scrap steel, add about 10 tons of light and thin material to the secondary material, and add about 10 tons of imported crushed material, the specification is 4t / m 3 , to increase the specific gravity of the pile and avoid pressing. Refractory steel scrap with large size such as tundish injection, briquetting and shearing materials cannot be used.
[0026] Oxygen supply system: Oxygen supply after the addition of molten iron, mainly furnace wall guns, control the total oxygen supply ≤ 600m 3 ; After the secondary molten iron is added, the flow rate of the main ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com