Equipment shadow and engineering machinery equipment remote scheduling management method, device and system
A technology for construction machinery and scheduling management, applied in data processing applications, instruments, structured data retrieval, etc., can solve problems such as low reliability of data uploading and sending, and poor remote scheduling management effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] In order to solve the problem of poor remote scheduling management effect caused by the low reliability of data upload and release between the construction machinery equipment terminal and the cloud service platform, after analysis, it is found that after the construction machinery equipment is connected to the cloud, due to the complex operating environment, Network fluctuations may cause the expected status of construction machinery and equipment to be incorrectly sent to vehicles. On the other hand, the cloud server may collect construction machinery status data in an incorrect state, resulting in undetected error data being sent to the data analysis module, affecting the final analysis results, and the scheduling management instructions based on the error analysis results will affect the operation of the machine tool. The effect of construction machinery scheduling management will further lead to deviation or even failure of intelligent network connection functions s...
Embodiment 2
[0051] Embodiment 2 of the present invention provides a device for remote scheduling and management of construction machinery equipment, which is applied to equipment shadows. image 3 It is a schematic structural diagram of a remote scheduling management device for construction machinery equipment in Embodiment 2 of the present invention, as shown in image 3 The device for remote scheduling and management of construction machinery equipment according to Embodiment 2 of the present invention includes a first receiving module 20 , a second receiving module 21 and a processing module 22 .
[0052] Specifically, the first receiving module 20 is configured to receive the expected state information of the construction machinery equipment sent by the preset server.
[0053] The second receiving module 21 is configured to receive the current state information reported by the construction machinery equipment.
[0054] The processing module 22 is configured to send the expected state...
Embodiment 3
[0057] An embodiment of the present invention also provides a device shadow, which may include a processor and a memory, where the processor and the memory may be connected through a bus or in other ways.
[0058] The processor may be a central processing unit (Central Processing Unit, CPU). The processor can also be other general-purpose processors, digital signal processors (Digital Signal Processor, DSP), application-specific integrated circuits (Application Specific Integrated Circuit, ASIC), field-programmable gate array (Field-Programmable Gate Array, FPGA) or other Chips such as programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, or combinations of the above-mentioned types of chips.
[0059] As a non-transitory computer-readable storage medium, the memory can be used to store non-transitory software programs, non-transitory computer-executable programs and modules, such as the program instructions corresponding to the re...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com