Construction method of quick replacement of suspension rods of mid-through and through arch bridges
A construction method and boom technology are applied in the construction field of rapid replacement of booms of mid-bearing and bottom-bearing arch bridges, which can solve the problems of increasing the danger of booms, complicated structural stress, low replacement efficiency, etc. The effect of hidden safety hazards, low construction risk and simple construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0082] The old Gaoming Bridge was built in 1989. The bridge site is located on the provincial highway S113, crossing the Xijiang River in the east-west direction. It is a super-large bridge on the main stream of the Xijiang River. m, two-way 4 lanes, the span combination is (78.5+4×82.6) top-supported reinforced concrete rib arch bridge + (2×110) medium-supported steel tube concrete suspension rod arch bridge + (5×79+68.2)m top support Type reinforced concrete rib arch bridge, the total width of the bridge deck is 13.35m, and the reinforced concrete deck. The Xijiang waterway at the Gaoming Bridge is an inland Class I waterway, with a 3000t ocean-going vessel passing through it, a clear navigable height of 22m, and a designed maximum navigable water level of 8.01m (Zhuji). The number of suspenders for the whole bridge is 36, the specification of the old suspenders is 5-109 steel wire, the strength of the steel wire is 1600Mpa, and the breaking force is 349.2t. According to th...
example 2
[0084] The Fochen Bridge in Foshan City was completed and opened to traffic in 1994, with a length of 883.84m and a main span of 115.80m. The bridge span combination is: (15×16)m prestressed hollow slab + (3×28.3)m reinforced concrete continuous beam + 112.8m under-supported steel pipe concrete tie rod arch + (3×28.3)m reinforced concrete continuous beam + ( 18×16)m prestressed hollow slabs with 40 spans in total. A total of 42 suspenders are installed on the two ribs of the main bridge with a spacing of 5m. The suspenders are all made of SNS / S-85×7mm galvanized steel wire extruded double-sheathed button pattern finished cables, the upper end of which is anchored on the inner anchor plate of the upper tube of the arch rib by LZM85IJ-7 type cold-cast heading anchor, and the lower end is A self-designed heading anchor is used to anchor in the beam. In April 2017, 6 bridges were tested using this construction method. During the whole suspender replacement process, the force sta...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com