110ksi-grade stainless steel oil pipe and manufacture method thereof
A manufacturing method, stainless steel technology, applied in the direction of drill pipe, casing, earthwork drilling, etc., can solve the problems of restricting the application of high-strength pipes, low strength, and reducing the strength of steel, and achieve the effect of excellent corrosion resistance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0030] Example 1, the mass percentage (wt.%) of each component in this example is: C: 0.010, Si: 0.05, Mn: 1.25, Cr: 18.30, Ni: 9.70, N: 0.12, and the manufacturing method is as follows:
[0031] (1) Smelting: After the molten steel is smelted in an electric furnace, it is VOD refined, and cast into a billet; it is electroslag remelted with argon protection, and the final billet is homogenized and annealed.
[0032] (2) Forging: Heating the steel billet to 1150-1200°C, keeping it warm for 45 minutes, and then forging the steel billet in multiple passes to make a forging billet.
[0033] (3) Tube billet making: peeling, centering and perforating the forged billet to make a tube billet.
[0034] (4) Extrusion and rolling: the tube billet enters the induction furnace to be heated, the heating temperature is 1050-1150 ° C, and the holding time is 30 minutes; the inner and outer surfaces of the tube billet are lubricated with glass powder and then expanded, and extruded on the extr...
Embodiment 2
[0041] Example 2, the mass percentage of each component in this example is: C: 0.012, Si: 0.04, Mn: 1.20, Cr: 18.10, Ni: 9.85, N: 0.15, and the manufacturing method is as follows:
[0042](1) Smelting: After the molten steel is smelted in an electric furnace, it is VOD refined, and cast into a billet; it is electroslag remelted with argon protection, and the final billet is homogenized and annealed.
[0043] (2) Forging: Heating the steel billet to 1150-1200°C, holding the temperature for 40 minutes, and performing multi-pass forging on the steel billet to make a forging billet.
[0044] (3) Tube billet making: peeling, centering and perforating the forged billet to make a tube billet.
[0045] (4) Extrusion and rolling: the tube billet enters the induction furnace to be heated, the heating temperature is 1000-1100 ° C, and the holding time is 25 minutes; the inner and outer surfaces of the tube billet are lubricated with glass powder and then expanded, and extruded on the ext...
PUM
Property | Measurement | Unit |
---|---|---|
Yield strength | aaaaa | aaaaa |
Tensile strength | aaaaa | aaaaa |
Yield strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com