Method for ecological restoration of mountain
An ecological restoration and mountain technology, applied in botany equipment and methods, horticulture, soil protection, etc., can solve the problems that groundwater cannot rise along the capillary, cannot achieve mountain restoration, and there are no rocks, so as to prevent the death of seedlings and benefit Thrive, reduce collapse effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
preparation example Construction
[0109] The preparation formula and preparation method of the rust inhibitor are respectively:
[0110] Preparation formula (parts by mass):
[0111] Polycarboxylate superplasticizer 100
[0112] Sodium lignosulfonate 12
[0114] Organic acids 32
[0115] Amino alcohol 15
[0116] Organic metal salt 0.6
[0118] water 270
[0119] The polycarboxylate water reducer is acrylic acid-itaconic acid-acrylic acid methoxy polyoxygen glycol macromonomer, and the organic acid is acrylic acid, methacrylic acid, adipic acid, pimelic acid, suberic acid, A mixture of azelaic acid, sebacic acid, benzoic acid and citric acid in any proportion, the amino alcohol is p-hydroxycyclohexylamine, p-hydroxy N-methylcyclohexylamine, p-hydroxy N,N-dimethylcyclohexylamine A mixture of amine, morpholine, ethanolamine and triisopropanolamine in any proportion, and the organometallic salt is a mixture of zinc dialkyldithiophosphate, zinc gl...
Embodiment 1
[0125] For steep rocky slopes with a height of more than 5m and a slope of 60-80°, the main steps are as follows:
[0126] (1) Remove movable rocks to ensure the firmness of the mountain;
[0127] (2) Drill holes with a pneumatic drill at a distance of 1.5m from the ground perpendicular to the mountain. The hole depth is 50cm. Holes are drilled on the damaged mountain, and when drilling on the undamaged mountain, it is usually selected to be adjacent to the part that connects with the slope of the rock slope;
[0128] (3) Inject 1:3 cement mortar into the hole until it is full;
[0129] (4) Insert the rebar with a length of 1m and a diameter of 18mm into the hole at a depth of 50cm (that is, to the bottom of the hole) as the basic reinforcement;
[0130] (5) Bind (or spot weld) a round steel with a diameter of 6mm as a horizontal reinforcement on the part of the threaded steel protruding out of the mountain, and the round steel extends along the horizontal direction at a cer...
Embodiment 2
[0148] For steep rock slopes with a height of less than 5m and a slope of 60°-90°, the main steps are as follows:
[0149] (1) Remove movable rocks to ensure the firmness of the mountain;
[0150] (2) Drill holes with a pneumatic drill at a distance of 1.5m from the ground perpendicular to the mountain. The hole depth is 50cm, and the opening is inclined upward at 45°. The distance between the holes in the vertical direction is usually 1.5m, and the horizontal direction is 1m. Drill holes on the undamaged mountain adjacent to the part where it meets the slope of the rock slope. When drilling holes on the slope, the upper and lower rows of holes should be staggered, preferably in the shape of plum blossoms;
[0151] (3) Fill the hole with 1:3 cement mortar until it is full;
[0152] (4) Insert the rebar with a length of 1m and a diameter of 18mm as the basic reinforcement into the hole to a depth of 50cm (that is, to the bottom of the hole);
[0153] (5) Bind (or spot weld) a...
PUM
Property | Measurement | Unit |
---|---|---|
thickness | aaaaa | aaaaa |
width | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com