Embodiment 1
[0022] In this embodiment, in the tundish casting furnace, after the first ladle of molten steel is cast, its sulfur content is detected to be 0.020, and the ladle is hoisted from the rotary table of the continuous casting machine with the workshop crane, and the small hook on the crane Hang the connecting piece at the bottom of the ladle, lift the small hook of the crane to overturn the ladle, and pour all the remaining steel slag and poured molten steel into another ladle after the steel is tapped from the converter. The ladle slag stays for 8 minutes after being suspended from the continuous casting, which avoids sticking to the bottom of the ladle. The smelting cycle is controlled at 24 minutes.
[0023] Refining is carried out after adding refining raw materials into the ladle. During the refining process, it is necessary to ensure that argon is blown throughout. In the stage of power supply, the pressure of argon is 0.4 MPa, and the flow rate of argon is 30 liters / min; (...
Embodiment 2
[0026] In this embodiment, in the tundish casting furnace, after the first ladle of molten steel is cast, its sulfur content is detected to be 0.025. The workshop crane is used to hang the ladle from the rotary table of the continuous casting machine. The small hook on the crane Hang the connecting piece at the bottom of the ladle, lift the small hook of the crane to overturn the ladle, and pour all the remaining steel slag and poured molten steel into another ladle after the steel is tapped from the converter. The ladle slag stays for 9 minutes after being suspended from the continuous casting, which avoids sticking to the bottom of the ladle. The smelting cycle is controlled at 25 minutes.
[0027] Refining is carried out after adding refining raw materials into the ladle. During the refining process, it is necessary to ensure that argon is blown throughout. In the stage of power supply, the pressure of argon gas is 0.4 MPa, and the flow rate of argon gas is 40 liters / min; ...
Embodiment 3
[0030] In this embodiment, in the tundish casting furnace, after the first ladle of molten steel is cast, its sulfur content is detected to be 0.045, and the ladle is hoisted from the rotary table of the continuous casting machine with the workshop crane, and the small hook on the crane Hang the connecting piece at the bottom of the ladle, lift the small hook of the crane to overturn the ladle, and pour all the remaining steel slag and poured molten steel into another ladle after the steel is tapped from the converter. The ladle slag stays for 9.5 minutes after being lifted from the continuous casting, which avoids sticking to the bottom of the ladle. The smelting cycle is controlled at 23 minutes.
[0031] Refining is carried out after adding refining raw materials into the ladle. During the refining process, it is necessary to ensure that argon gas is blown throughout. In the stage of power supply, the pressure of argon gas is 0.4 MPa, and the flow rate of argon gas is 47 li...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com