Asphalt mixture anti-rutting additive and preparation and use method thereof
A technology of anti-rutting additives and asphalt mixtures, applied in building insulation materials, building components, buildings, etc., can solve the problems of small application range and poor recovery ability, and achieve improved physical properties, reduced sensitivity, and increased adhesion effect of ability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] Taking the production of 100kg of the present invention as an example, the raw materials used are:
[0020] Polyethylene 50kg, polypropylene 20kg, PVC 15kg, rubber 3kg, asphalt 7kg, toughening agent 3kg, UV anti-aging agent 2kg;
[0021] The above raw materials are mixed together and stirred evenly, put into a screw extruder, heated to 120°C-160°C and melted to make a uniform material, then extruded into strips, cooled and cut into pellets.
[0022] When using: When the asphalt mixture is heated to 170-180°C, the above granular product is directly put into the mixing pot containing the asphalt mixture for dry mixing. The dry mixing time is 5 to 10 seconds, and then the hot asphalt is added to continue. Stir, the wet mixing time is 45 to 50 seconds.
Embodiment 2
[0024] Taking the production of 100kg of the present invention as an example, the raw materials used are:
[0025] Polyethylene 35.5kg, polypropylene 23.5kg, PVC 24kg, rubber 1.5kg, asphalt 10kg, toughening agent 2.5kg, UV anti-aging agent 3kg;
[0026] The above raw materials are mixed together and stirred evenly, put into a screw extruder, heated to 130°C-170°C and melted to make a uniform material, then extruded into strips, cooled and cut into pellets.
[0027] When using: When the asphalt mixture is heated to 170-180°C, the above granular product is directly put into the mixing pot containing the asphalt mixture for dry mixing. The dry mixing time is 5 to 10 seconds, and then the hot asphalt is added to continue. Stir, the wet mixing time is 45 to 50 seconds.
Embodiment 3
[0029] Taking the production of 100kg of the present invention as an example, the raw materials used are:
[0030] Polyethylene 28kg, polypropylene 33kg, PVC 21kg, rubber 5kg, asphalt 6kg, toughening agent 4kg, UV anti-aging agent 3kg;
[0031] The above raw materials are mixed together and stirred evenly, put into a screw extruder, heated to 110°C-150°C and melted to make a uniform material, then extruded into strips, cooled and cut into pellets.
[0032] When using: When the asphalt mixture is heated to 170-180°C, the above granular product is directly put into the mixing pot containing the asphalt mixture for dry mixing. The dry mixing time is 5 to 10 seconds, and then the hot asphalt is added to continue. Stir, the wet mixing time is 45 to 50 seconds.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com