Cross-shaped steel rib column full-bolt rigid connection joint and construction method

A cross-shaped steel and rigid connection technology, applied in the direction of columns, pier columns, pillars, etc., can solve the problems of laborious installation process, difficult component transportation, and potential safety hazards, so as to improve the overall stability and bearing capacity and save welding Weld inspection cost and effect of reducing welding work load

Pending Publication Date: 2022-01-14
CHINA CONSTR IND & ENERGY ENG GRP CO LTD +1
View PDF7 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] When bolted and welded joints and all-welded joints are installed on site, traditional penetration welding is used, which easily leads to large welding residual stress on the steel, making the steel at the joints prone to delamination or brittle failure; and the on-site welding workload is large, Affected by factors such as the technical proficiency of on-site welders and the welding environment, it is difficult to effectively guarantee the welding quality, which has a great impact on the mechanical properties of the joint joints, and the weld seam has poor anti-corrosion durability, burying safety hazards for the mechanical performance of the joint joints; At the same time, according to GB50661 "Steel Structure Welding Code", on-site welding inspections are required, such as weld appearance quality inspection, ultrasonic inspection of weld internal defects, etc., which will increase the cost accordingly; and for the web connection plate, its weight is large and installation Difficult, low installation efficiency, laborious installation process and potential safety hazards
However, the full-bolt connection needs to open holes in the components during the manufacturing process, which requires a large amount of manufacturing work, and the bolt holes opened in the steel beam flange and web will weaken the component section.
[0006] 16G519 "Multiple and high-rise civil building steel structure joint structure details" records as follows Figure 10 The beam-column rigid connection joint form of the column corbel shown in the figure is that the cantilever beam section is fully welded or bolted to the column and the middle beam section, and the length of the cantilever beam section protruding from the column center line is greater than or equal to the beam height. Welding is completed, which will cause the problem of difficulty in transporting components and high transport costs

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cross-shaped steel rib column full-bolt rigid connection joint and construction method
  • Cross-shaped steel rib column full-bolt rigid connection joint and construction method
  • Cross-shaped steel rib column full-bolt rigid connection joint and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but the protection scope of the present invention is not limited thereto.

[0040] In the description of the present invention, it should be understood that the orientation or positional relationship indicated by the terms "upper", "lower", "middle", "inner surface" and "outer surface" are based on the orientation or positional relationship shown in the drawings. The positional relationship is only for the convenience of describing the present invention, and cannot be understood as a limitation of the present invention; the use of "first" and "second" is also for the convenience of describing the present invention, and cannot be understood as a limitation of the present invention; Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention according to specific situations.

[0041] Such as ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a cross-shaped steel rib column full-bolt rigid connection joint and a construction method. A cross-shaped steel rib column, a steel beam and corresponding connecting parts are prefabricated and machined in a factory in advance, the on-site welding construction workload is reduced, only bolts need to be adopted for assembling on site, rapid installation and screwing can be achieved through the high-strength bolts, bulk assembling of connecting plates is avoided, construction is convenient, efficiency is high, time and labor are saved, the risk of high-altitude welding operation is greatly reduced, and the core concept of green buildings and green construction in China is met. The cross-shaped steel rib column and the steel beam are mainly stressed components, the section integrity is kept, no bolt hole is formed in the section, no section is weakened, meanwhile, the connecting pieces can achieve design standardization and manufacturing standardization, and the industrial construction level is further improved. The joint belongs to strong-joint weak-rod piece connection, the defects of a traditional rigid connection joint are overcome, and the joint is supplementary extension of a beam column rigid connection joint in a national standard atlas 16G519.

Description

technical field [0001] The invention belongs to the technical field of construction engineering, and in particular relates to a full-bolt rigid connection node of a cross-shaped steel frame column and a construction method. Background technique [0002] With the introduction of steel structure building industrialization and prefabricated building policies, green buildings and building materials have been widely promoted, steel structures and prefabricated buildings have been vigorously developed, the level of mechanized construction has been significantly improved, and the level of construction industrialization has been effectively improved. [0003] At present, more and more high-rise buildings use steel structures as their main structures, and cross-shaped steel columns are widely used as the main force-bearing components of multi-storey, high-rise and super high-rise buildings due to their high bearing capacity, high stability and strong rigidity. . In the frame structu...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04B1/58E04B1/24E04C3/06E04C3/32E04B1/98E04H9/02E04G21/14
CPCE04B1/2403E04C3/06E04C3/32E04B1/98E04H9/021E04H9/024E04G21/14E04B2001/2406E04C2003/0452
Inventor 卓旬张甫平徐艳红张璇璇王会乾任洁刘欣
Owner CHINA CONSTR IND & ENERGY ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products