Integrated sewage treatment device and method for highway service area
The technology of a sewage treatment device and a sewage treatment method, which is applied in the field of water treatment, can solve the problems of shock load, large shock load of sewage water quality and quantity, and large change of sewage quantity, so as to reduce the shock load of water quantity, improve the water holding capacity, and improve the treatment capacity. effect of load
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0053] The existing sewage treatment device in the expressway service area has the problems of high sewage impact load, high nitrogen and phosphorus content, and low carbon-nitrogen ratio. In view of this, this embodiment designs an integrated sewage treatment device in the expressway service area.
[0054] Such as figure 1 As shown, the integrated sewage treatment device in the expressway service area of this embodiment includes a water inlet pipe 1, a regulating tank 2, a multi-stage AO tank 3, a membrane bioreactor 4, an outlet pump 5, an inlet flow distribution module 6, an aeration Module 7, backflow adjustment module 8 and biological carrier; water inlet pipe 1 is used to input sewage into the sewage treatment device, one end of water inlet pipe 1 is connected with septic tank and grease trap, and the other end is connected with regulating tank 2, septic tank The feces are treated and filtered and precipitated. The grease trap removes the oily substances in the caterin...
Embodiment 2
[0065] The integrated sewage treatment method in the expressway service area of this embodiment is based on the integrated sewage treatment device in the expressway service area in Embodiment 1, wherein the multi-stage AO pool 3 of the sewage treatment device is three-stage as an example, that is, the multi-stage AO The pool 3 includes a primary anoxic pool 300, a primary aerobic pool 310, a secondary anoxic pool 301, a secondary aerobic pool 311, a tertiary anoxic pool 302, and a tertiary aerobic pool 312 arranged in sequence. The first-level aerobic pool 312 is the last-level aerobic pool 31.
[0066] After the sewage in the expressway service area enters the septic tank and the grease trap, it enters the regulating tank 2 through the water inlet pipe 1, and the residence time is 6-12 hours. Into the first-level anoxic pool 300, the second-level anoxic pool 301 and the third-level anoxic pool 302, the water inflow ratio is 3:5:2, and the hydraulic retention time of each le...
PUM
Property | Measurement | Unit |
---|---|---|
particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com