Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Surrounding rock reinforcement method for junction tunnel section in upper-soft lower-hard stratum constructed adopting shield method and mining method

A junction, hard stratum technology, applied in tunnels, tunnel linings, underground chambers, etc., can solve the problems of high water inrush risk, high risk of dissolved water, pipeline fracture and damage, etc.

Active Publication Date: 2020-03-13
THE FOURTH ENG CO LTD OF CHINA RAILWAYNO 20 BUREAU GRP
View PDF5 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the above-mentioned single reinforcement method still cannot guarantee the construction safety of the tunnel section at the junction of the shield tunneling method and the mining method where the surrounding rock is relatively broken and rich in water, and there are the following risks: First, sand and landslide risks: due to the large excavation section , the vault is buried shallowly and the surrounding rock is relatively broken. Under the influence of tunnel blasting construction and direct hole grouting in the cave, it is very easy to cause sand gushing and landslide disasters in the cave; sand gushing and landslides in the cave cause the loss of the stratum above the tunnel, which will cause Developed into surface subsidence, pipeline fracture and damage; second, poor lithology, high risk of water inrush: poor lithology and thicker medium-coarse sand layer in the upper part, low-lying terrain, large water volume, sufficient supply, large confined water, and intrusive water high risk

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Surrounding rock reinforcement method for junction tunnel section in upper-soft lower-hard stratum constructed adopting shield method and mining method
  • Surrounding rock reinforcement method for junction tunnel section in upper-soft lower-hard stratum constructed adopting shield method and mining method
  • Surrounding rock reinforcement method for junction tunnel section in upper-soft lower-hard stratum constructed adopting shield method and mining method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0088] Such as figure 1 Shown is a reinforcement method for the surrounding rock of the tunnel section at the junction of the upper soft and lower hard stratum shield method and the mining method, the tunnel section at the junction of the construction is a shallow buried tunnel with a buried depth of less than 30m; combined Figure 10 , the junction tunnel section is located at the junction between the excavated tunnel 1 and the tunnel to be excavated 3, the excavated tunnel 1 is a tunnel formed by mining method, and the tunnel to be excavated 3 is located at the Excavation of the shield tunnel ahead of Tunnel 1; combined with figure 2 , the tunnel section at the junction is formed by connecting an excavated tunnel section with an unexcavated tunnel section located in front of the excavated tunnel section, and the excavated tunnel section is a front part of the excavated tunnel 1 The tunnel segment and its length is L1, and the value range of L1 is 4m ~ 6m; the unexcavated t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Buried depthaaaaaaaaaa
Outer diameteraaaaaaaaaa
Wall thicknessaaaaaaaaaa
Login to View More

Abstract

The invention discloses a surrounding rock reinforcement method for a junction tunnel section in an upper-soft lower-hard stratum constructed adopting a shield method and a mining method. The method comprises the steps that 1, tunnel face grouting reinforcement is carried out, specifically, grouting reinforcement is carried out on stratum in front of an excavation face of an upper tunnel body by adopting grouting pipes; 2, junction surface grouting reinforcement is carried out, specifically, grouting reinforcement is carried out on the reinforced stratum by adopting sleeve valve pipes; 3, tunnel arch part advanced support is carried out, specifically, advanced support is carried out on an arch part of the junction tunnel section; 4, grouting pipe removal is carried out; and 5, tunnel faceplugging is carried out, specifically, a tunnel face is plugged through concrete backfilling, and a tunnel face plugging structure is obtained. The method is reasonable in design, simple and convenient to construct and good in use effect, and surrounding rock of the junction tunnel section is effectively reinforced by the method of combining the surface grouting reinforcement with the in-tunnel reinforcement so that the mechanical property of the surrounding rock can be effectively improved; and the tunnel face of the junction tunnel section is reliably plugged before and after reinforcement so that tunnel safety construction can be effectively guaranteed, and ground settlement caused by excavation can be effectively reduced.

Description

technical field [0001] The invention belongs to the technical field of tunnel construction, and in particular relates to a method for reinforcing the surrounding rock of a tunnel section at the junction of the upper soft and lower hard stratum shield method and the mining method. Background technique [0002] The mining method (also known as the shallow burial method) refers to the construction method of tunnel construction by excavating underground tunnels. The mining method is a tunnel excavation construction method of the underground method, mainly using the drilling and blasting method The construction method of excavating sections to build tunnels and underground works. The shield tunneling method is a fully mechanized construction method in the underground excavation method. It pushes the shield machine in the ground, and supports the surrounding rock through the shield casing and segments to prevent collapse into the tunnel; A mechanized construction method in which ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D9/00E21D9/14E21D11/10E21D11/14E21D20/02
CPCE21D9/001E21D9/14E21D11/105E21D11/14E21D20/02
Inventor 韩超张利军张林肖先刘金明
Owner THE FOURTH ENG CO LTD OF CHINA RAILWAYNO 20 BUREAU GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products