Tide-sensing river channel flood prevention and moisture prevention shoreline making method
A technology for river channels and floods, which is applied in the field of tidal river channel flood control and tide control shoreline formulation, can solve the problem that the model is difficult to obtain accurate verification and other problems, and achieve the effects of ensuring flood discharge capacity, enriching environmental conditions, and clear physical concepts.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Taking the shoreline from Houguan Sluice to Bishuiqinwan in the lower reaches of the Minjiang River in Fuzhou as an example of this implementation, the formulation method considers the dual effects of floods and tidal currents, especially the long-term effects of tidal currents, and formulates a method for formulating flood and tidal prevention coastlines, including the following Step, with reference to the hydrological data in previous years, establish a physical model and a mathematical model of the river course, the mathematical model includes a two-dimensional mathematical model, a three-dimensional mathematical model, and the physical model of the river course includes three levels of flow tests of flood, medium and dry; The model is coupled with the two-dimensional mathematical model and the three-dimensional mathematical model. The physical-numerical coupling is embodied in the following three aspects: ① simulate hydraulic boundary conditions, and use the two-dimen...
Embodiment 2
[0072] The modified coastline of Changle Huangshi to Yanshan section in Sanjiangkou District, the intersection of Minjiang River and Beigang, is used as this embodiment. The flood standard adopts a 100-year flood, and the discharge flow of the Shuikou Dam is 35,700m 3 / s, the corresponding Dazhangxi discharge flow is 3000m 3 / s, the flood process is 7 days, considering that the embankments on both sides of the lower reaches of the Minjiang River do not overflow, and considering that the Shuikou Dam discharges 308m in the dry season 3 / s, the tidal level of the East China Sea adopts the 7-day process corresponding to the multi-year average high tide level at Meihua Station from April to July. Two working conditions are considered for the flood-tide combination in the flood season: (1) The upper boundary condition is the 100-year flood process, and the flood peak meets the high tide level when it reaches the revised area of the Changle coastline. (2) The upper boundary condi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com