Room temperature controllable curing building adhesive and preparation method thereof
A room temperature curing, construction adhesive technology, applied in the direction of adhesives, epoxy resin adhesives, adhesive types, etc., can solve the problems of high viscosity, short operating time, easy to explode, etc., and achieve low viscosity and long operating time. , The effect of large amount of glue
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0023] 1. Preparation of the first glue solution
[0024] 65 parts of bisphenol A epoxy resin (Wuxi Resin Factory) (the same as below by weight), 25 parts of bisphenol F epoxy resin (Wuxi Diaisheng Epoxy Co., Ltd.), 4 parts of long-chain fatty alkanes, ether diluent 3 parts, stir well, mix well.
[0025] 2. Preparation of the second glue solution
[0026] Mix 16 parts of long-chain liquid aliphatic amine, 15 parts of nitrile rubber, 1.6 parts of accelerator DMP-300, and 1 part of coupling agent KH-5501.
[0027] 3. Fully mix the two components of the first glue solution and the second glue solution and stir evenly before use. This formula can be operated for up to 4 hours (at 20°C), and can be fully cured in 24 hours. Steel-steel shear strength is greater than 20MPa, and can meet other performance requirements of building structure adhesives in national standards. Example 2:
Embodiment 2
[0028] 1. Preparation of the first glue solution
[0029] 15 parts of bisphenol A epoxy resin (Wuxi Resin Factory) (the same as below by weight), 5 parts of bisphenol F epoxy resin (Wuxi Diaisheng Epoxy Co., Ltd.), 0.4 part of long-chain fatty alkane, ether diluent 1 part, stir well and mix well.
[0030] 2. Preparation of the second glue solution
[0031] Mix 4.5 parts of long-chain liquid fatty amine, 5 parts of nitrile rubber, 1.6 parts of accelerator DMP-30, and 1 part of coupling agent KH-550, and mix well.
[0032] 3. Fully mix the two components of the first glue solution and the second glue solution and stir evenly before use. This formula can be operated for up to 3.6 hours (at 20°C), and a relatively complete cure can be achieved in 24 hours. Steel-steel shear strength is greater than 21MPa, and can meet other performance requirements of building structure adhesives in national standards. Example 3:
Embodiment 3
[0033] 1. Preparation of the first glue solution
[0034] 30 parts of bisphenol A epoxy resin (Wuxi Resin Factory) (the same as below by weight), 70 parts of bisphenol F epoxy resin (Wuxi Diaisheng Epoxy Co., Ltd.), 4 parts of long-chain fatty alkanes, ether diluent 1 part, stir well and mix well.
[0035] 2. Preparation of the second glue solution
[0036] Mix 18 parts of long-chain liquid fatty amine, 16 parts of nitrile rubber, 1.6 parts of accelerator DMP-30, and 08 parts of coupling agent KH-550, and mix well.
[0037] 3. Fully mix the two components of the first glue solution and the second glue solution and stir evenly before use. The working time of this formula can reach 3.0 hours (at 20°C), and a relatively complete cure can be achieved in 24 hours. The steel-steel shear strength can reach 28MPa, and can meet other performance requirements of building structure adhesives in national standards.
PUM
Property | Measurement | Unit |
---|---|---|
Shear strength | aaaaa | aaaaa |
Shear strength | aaaaa | aaaaa |
Shear strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com