Waste rubber powder modified asphalt composition for increasing storage stability and preparation method thereof
A technology of modified asphalt and composition, which is applied in the direction of building structure, building components, building insulation materials, etc. It can solve the problems of complex process, deterioration of asphalt properties, unfavorable production, etc., and achieve simple ingredients, low production cost, and high production The effect of simple method
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0021] 400 grams of base asphalt with a penetration (25°C, 0.1mm) of 94, first heated to 160°C to melt; add 13% of treated 80-mesh rubber powder (with a liquid additive accounting for 5% of the weight of the rubber powder [Zibo Qi 1502 latex produced by Xiang Industry and Trade Co., Ltd.] Spray and wrap the rubber powder, dry at 80°C for 1 hour.) and 0.15% sulfur cross-linking agent, and shear at 180°C for 90 minutes. Compared with the modified asphalt without rubber powder pretreatment, the stability of the rubber powder modified asphalt is significantly improved, and the difference between the upper and lower softening points of the segregation test changes from -5.5°C to -0.5°C, fully reaching The technical requirements for storage stability of SBS modified asphalt have been stipulated.
Embodiment 2
[0023] Compared with Example 1, the difference between this example and Example 1 is that 2% of SBS polymer is added, and the prepared rubber powder modified asphalt not only has qualified storage stability, but also has other properties that can fully meet the requirements stipulated by the Ministry of Communications. JTG F40-2004 polymer modified asphalt I-C technical index requirements. Penetration of the modified asphalt (25°C, 0.1mm) is 73, softening point: 55.0°C, ductility at 5°C: 31cm, difference between upper and lower softening points after storage: -0.5°C, needle ratio after TFOT: 80%, after TFOT 5°C ductility: 22cm.
Embodiment 3
[0025] 400 grams of base asphalt with a penetration (25°C, 0.1mm) of 90, heated and melted first; add 15% of treated 120-mesh rubber powder (with a liquid additive [polybutadiene latex] accounting for 20% of the weight of the rubber powder , Zibo Yuming Industrial Co., Ltd.] Spray and wrap the rubber powder, dry at 100°C for 40 minutes), cut at 190°C for 90 minutes, and then add 1.5% of SBS, 1.0% of SBR and 0.2% of bismuth Tetramethylthiuram sulfide, and then continue to shear for 60 minutes. The modified asphalt has a penetration (25°C, 0.1mm) of 70, a softening point of 58.5°C, a ductility of 5°C of 35cm, and a difference between the upper and lower softening points after storage: -1.0°C.
PUM
Property | Measurement | Unit |
---|---|---|
Softening point | aaaaa | aaaaa |
Extensibility | aaaaa | aaaaa |
Softening point | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com