Method of flow management based on tunnel and radio access relay system
A flow management and tunneling technology, applied in the field of communication, can solve the problem of not proposing RS
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 2 example
[0110] For the method described in the present invention, the present invention provides a second embodiment, comprising:
[0111] Step 101: Establish a tunnel-based Layer 2 communication path between the data bearing point of the base station BS and the data bearing point of the relay station RS to which the mobile subscriber station / subscriber station MSS / SS belongs.
[0112] Between the Anchor BS (anchor BS) data bearing point (Data Path Fucnction) and the RS data bearing point to which the MSS / SS belongs, a tunnel-based Layer 2 communication path (Path) is established. The tunnel can be implemented by specific tunneling protocols such as GRE. accomplish. There are three situations for the granularity selection of the tunnel between the anchor BS and RS, such as image 3 Shown:
[0113] Establish a tunnel between anchor BS and RS based on service flow
[0114] · Tunnel between MSS / SS anchor point BS and RS
[0115] Establish a tunnel between anchor BS and RS based on RS...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com