Efficient pipeline steel L245N production process
A production process and pipeline steel technology, which is applied in the field of high-efficiency pipeline steel L245N production process, can solve the problems of low yield and poor pass rate of pipeline steel, and achieve the effects of improving performance pass rate, increasing strength, and refining grains
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] The production process of L245N grade pipeline steel plate, the composition and mass percentage of steel are: C=0.12, Si=0.16, Mn=1.10, P=0.017, S=0.002, Al=0.032, Nb=0.015, Ti=0.010, Ce = 0.0003.
[0035] The main process steps and parameters are as follows:
[0036] The molten iron must be pretreated before entering the furnace. After the treatment, the sulfur content of the molten iron is ≤0.010%, and the temperature is ≥1250°C. The slag must be cleaned before the molten iron enters the converter. About 85%, scrap about 15%. Converter end point control C-T coordinated tapping, P≤0.012%, S≤0.015%, strict slag blocking and tapping, tapping time 4-7min, adding alloy at 1 / 5 of tapping, adding alloy at 2 / 5 of tapping, During the tapping process, depending on the oxygen content at the end point, add an appropriate amount of modifier and lime, the oxygen should not be less than 250m, and make appropriate adjustments depending on the loading amount, the end point C, and th...
Embodiment 2
[0046] The production process of L245N pipeline steel plate, the composition and mass percentage of steel are: C=0.11, Si=0.15, Mn=1.15, P=0.012, S=0.002, Al=0.026, Nb=0.016, Ti=0.012, Ce = 0.0003.
[0047] The main process steps and parameters are as follows:
[0048] The molten iron must be pretreated before entering the furnace. After the treatment, the sulfur content of the molten iron is ≤0.010%, and the temperature is ≥1250°C. The slag must be cleaned before the molten iron enters the converter. About 85%, scrap steel about 15%. Converter end point control C-T coordinated tapping, P≤0.012%, S≤0.015%, strict slag blocking and tapping, tapping time 4-7min, adding alloy at 1 / 5 of tapping, adding alloy at 2 / 5 of tapping, During the tapping process, depending on the oxygen content at the end point, add an appropriate amount of modifier and lime, the oxygen should not be less than 250m, and make appropriate adjustments depending on the loading amount, the end point C, and th...
PUM
Property | Measurement | Unit |
---|---|---|
crystal size | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com