Anchorage design and construction method
A construction method and anchoring technology, which is applied in bridge construction, infrastructure engineering, erection/assembly of bridges, etc., to achieve the effect of increasing the design safety factor, less land occupation area, and clear force
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment
[0075] Such as Figures 8 to 10 As shown, the project of the present invention adopts the "temporary anchorage method" to carry out the construction of the main bridge superstructure "first cable and then girder". The temporary anchorage 8 is designed by utilizing the original permanent structure pile foundation 1 and cap 4 of the approach bridge. Shatian Town on the east bank is located at pier 20#~21# of the approach bridge, and one is set on the left and right sides; Nizhou Island on the west bank is located on pier 28#~29# of the approach bridge, and one is set on the left and right sides of the approach bridge, and the temporary anchorage 8 is arranged as follows Figure 8 and Figure 9 shown.
[0076] A total of 4 anchorages 8 are designed for the whole bridge. A single anchorage 8 is equipped with 20 Φ1.8m bored piles. The pile lengths are 23.9m and 29.1m. way of construction. And the pile foundation uses the steel casing as an anti-corrosion barrier, and participate...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com