Ecological protection system for waste limestone slag yard
An ecological protection and waste slag field technology, applied in planting substrates, agricultural machinery and implements, construction, etc., can solve problems such as difficulty in ensuring stable growth of plants, difficulty in maintaining long-term stability of limestone waste slag fields, and easy nutrient loss.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] An ecological protection system of limestone slag, such as figure 1As shown, it includes a slag layer 1 , a water guide cloth 2 and a functional layer 3 arranged in sequence from bottom to top, and several anchor rods 4 for fixing the water guide cloth 2 and the functional layer 3 on the slag layer 1 . Wherein, the anchor rod 4 adopts threaded steel with a diameter of 12 cm and a length of 35 cm.
[0041] The gravel layer 1 includes a bottom layer 5, and a transition layer 6 above the bottom layer 5 and poured with a stabilizer. Wherein, the thickness of the transition layer 6 is 100 cm, and the thickness of the bottom layer 5 is 80 cm. The stabilizer comprises 10 parts of bacillus pasteurian culture liquid filtrate, 2 parts of urea aqueous solution with a mass concentration of 10%, and 3 parts of ferrous sulfate aqueous solution with a mass concentration of 10%, in parts by weight.
[0042] The functional layer 3 includes a matrix layer 7 and functional nets 8 respec...
Embodiment 2
[0045] An ecological protection system of limestone slag, such as figure 1 As shown, it includes a slag layer 1 , a water guide cloth 2 and a functional layer 3 arranged in sequence from bottom to top, and several anchor rods 4 for fixing the water guide cloth 2 and the functional layer 3 on the slag layer 1 . Wherein, the anchor rod 4 adopts threaded steel with a diameter of 12 cm and a length of 35 cm.
[0046] The gravel layer 1 includes a bottom layer 5, and a transition layer 6 above the bottom layer 5 and poured with a stabilizer. Wherein, the thickness of the transition layer 6 is 100 cm, and the thickness of the bottom layer 5 is 80 cm. The stabilizer comprises 30 parts of bacillus pasteurian culture fluid filtrate, 5 parts of urea aqueous solution with a mass concentration of 15%, and 6 parts of ferrous sulfate aqueous solution with a mass concentration of 15%, in parts by weight.
[0047] The functional layer 3 includes a matrix layer 7 and functional nets 8 respec...
Embodiment 3
[0050] An ecological protection system of limestone slag, such as figure 1 As shown, it includes a slag layer 1 , a water guide cloth 2 and a functional layer 3 arranged in sequence from bottom to top, and several anchor rods 4 for fixing the water guide cloth 2 and the functional layer 3 on the slag layer 1 . Wherein, the anchor rod 4 adopts threaded steel with a diameter of 12 cm and a length of 35 cm.
[0051] The gravel layer 1 includes a bottom layer 5, and a transition layer 6 above the bottom layer 5 and poured with a stabilizer. Wherein, the thickness of the transition layer 6 is 100 cm, and the thickness of the bottom layer 5 is 80 cm. The stabilizer comprises 20 parts of bacillus pasteurian culture liquid filtrate, 3.5 parts of urea aqueous solution with a mass concentration of 12%, and 4.5 parts of ferrous sulfate aqueous solution with a mass concentration of 15%, in parts by weight.
[0052] The functional layer 3 includes a matrix layer 7 and functional nets 8 r...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com